Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 339 SW MARYNIK DR
HIGH SPRINGS, FL 32643
Parcel #: 10006-204
Acres: 5.10
Owner: Condo Steven Kline, Condo Kendra Rothhaar
Subdivision: River Rise Residential Unit 1
Zoning: A-3
Flood Zone: X
District: 4
Application #: 55365
Permit #: 000044926
Related Permit: Culvert: 000044927
Submitted: Friday, June 24, 2022
Issued: Monday, July 11, 2022
Expires: Thursday, March 2, 2023
Completed: Thursday, March 2, 2023
Status: Completed
Septic Release? Yes
Notes:
FINISHED FLOOR ONE FOOT ABOVE ROAD OR ENGINEER LETTER WITH SURVEYOR CONFIRMATION
Job Details
Elevation regulation Minimum Requirement
Finished floor requirement One foot above the road
Fema map number 12023C0513C
In floodway N
This is the construction of a Single Family Dwelling
Setbacks Front 30'
Setback Side 1 25'
Setback Side 2 25'
Setbacks Rear 25'
Stories 1
Heated Area (Sqft) 2155
Total Area (Sqft) 3400
Building Height 23
Building Code Construction Type V
Building Code Element B
Building Code Occupancy Types Residential
Occupancy Use Title single family dwelling
Building Code Edition 2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000) 22-0526
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition) two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Service Amps 200
Review Notes
6/29/2022 Plan Review - Building Approved
6/29/2022 Plan Review - Electrical Approved
6/29/2022 Plan Review - Mechanical Approved
6/29/2022 Plan Review - Plumbing Approved
6/29/2022 Plan Review - Fuel/Gas Approved
6/29/2022 Plan Review - Reviewed
6/29/2022 Zoning Review - Reviewed
6/30/2022 Point Review - Reviewed
6/30/2022 Final Review - Documents Required
7/7/2022 Final Review - Reviewed
7/7/2022 Final Review - Payment Needed
7/11/2022 Permit Issued
1/4/2023 Final Review - Payment Needed
Contractors
Name/ Business License Title Role
Mark Bauer
Gibraltar Contracting Llc
CBC1259633 Cert Building Contractor
Ryan C Beville
Rbi Electrical Contracting Llc
EC13004236 Electrical Contractor Subcontractor
Clinton G Wilson
Wilson Heat & Air Inc
CAC057886 Class B A/c Subcontractor
James Butler Jr
Butler Plumbing Of Gainesville Inc
CFC057960 Plumbing Contractor Subcontractor
Lewis G Walker
Lewis Walker Roofing Inc
CCC1333551 Cert. Roofing Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Engineering - Setbacks Anthony Aslan 7/14/2022
Passed: Building - Footer Clean Out Any Cave In Anthony Aslan 7/14/2022
Passed: Plumbing/Gas - 1st Underground Rough–In Anthony Aslan 8/4/2022
Cancelled: Building - Roof Decking Anthony Aslan 8/11/2022
Cancelled: Building - Wall Sheathing Anthony Aslan 8/11/2022
Passed: Building - Slab Termite Is Bait System Anthony Aslan 8/11/2022
Cancelled: Building - Roof Decking Anthony Aslan 8/11/2022
Cancelled: Building - Wall Sheathing Anthony Aslan 8/11/2022
Passed: Electrical - Temporary Service Anthony Aslan 8/11/2022
Release to power company Anthony Aslan 8/11/2022
Passed: Building - Roof Decking Anthony Aslan 9/15/2022
Passed: Building - Wall Sheathing Anthony Aslan 9/15/2022
Passed: Engineering - Initial Driveway Smith, Blake 9/22/2022
Passed: Building - Framing Anthony Aslan 10/5/2022
Passed: Electrical - 2nd Rough-In Anthony Aslan 10/5/2022
Passed: Mechanical - Rough In Anthony Aslan 10/5/2022
Passed: Plumbing/Gas - 2nd Rough-In Anthony Aslan 10/5/2022
Passed: Building - Insulation Walls Only Anthony Aslan 10/10/2022
Passed: Electrical - Permanent Power Need Septic Release Anthony Aslan 1/4/2023
Passed: Engineering - Final Driveway Smith, Blake 1/13/2023
Release to power company Melissa Garber 1/17/2023
Septic Release Inspection Health Dept 1/17/2023
Passed: Building - Final Anthony Aslan 3/2/2023