Mobile Home
Permit
| Application #: | 55376 |
| Permit #: |
000044910 |
| Related Permit: |
|
| Submitted: | Monday, June 27, 2022 |
| Issued: | Thursday, July 7, 2022 |
| Expires: | Sunday, May 21, 2023 |
| Completed: | |
| Status: |
Permit Issued |
| Septic Release? |
Yes |
Job Details
| Elevation regulation |
Minimum Requirement |
| Finished floor requirement |
One foot above the road |
| Fema map number |
12023C0410C |
| In floodway |
N |
| Mobile Home is a: |
Double Wide |
| Year Built |
1993 |
| Width (Ft.In) |
28 |
| Length (Ft.In) |
48 |
| Driveway access to home: |
Existing Drive |
| Installation Decal # |
92024 |
| Septic # |
22-0567 |
| Setbacks Front |
30' |
| Setback Side 1 |
25' |
| Setbacks Rear |
25' |
| Dev Permit # |
F023- |
| Setback Side 2 |
25' |
| Are you applying for a 5 year temporary permit? |
No |
| Serial # |
fhlmlxp5379674a/flhmlcp53579674b |
| Wind Zone? |
2 |
| Residential or Commercial Use? |
Residential |
Review Notes
| 6/27/2022 |
Point Review - Printed-Online Application |
| 6/27/2022 |
Point Review - Reviewed |
| 6/30/2022 |
Plan Review - Reviewed |
| 7/1/2022 |
Zoning Review - Reviewed |
| 7/5/2022 |
Final Review - Documents Required |
| 7/5/2022 |
Final Review - Documents Required |
| 7/6/2022 |
Final Review - Reviewed |
| 7/6/2022 |
Final Review - Payment Needed |
| 7/7/2022 |
Permit Issued |
Contractors
| Name / Business |
License |
Title |
Role |
Ronald "ryan" Norris Norris Mobile Home Mover & Set Up
|
IH1135009 |
Mh Installer (ih) |
Contractor |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Passed: Mobile Home - In County Pre-Mobile Home before set-up |
|
Matt Forsyth |
6/28/2022 |
| Septic Release Inspection |
|
Health Dept |
7/6/2022 |
| Passed: Mobile Home - Mobile Home Set-Up Final |
Holes In Pole Panel Need To Be Blanked Off |
Anthony Aslan |
11/22/2022 |
| Passed: Engineering - Setbacks |
|
Anthony Aslan |
11/22/2022 |