Permit Details

Permit Search

Permit

Mobile Home

194 SW LOGSTON CT
FORT WHITE, FL 32038

Permit #
000044839
Application #
55000
Status Completed
  1. Submitted May 26, 2022
  2. Issued Jun 29, 2022
  3. Expires Jun 4, 2023
  4. Completed Dec 13, 2022

Property

Parcel #
03767-102
Owner
Travis Christopher, Travis Keri
Acres
5.02
Subdivision
Sedgefield Phase 1
Zoning
A-3
Flood zone
X
District
4

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0480C
In floodway
N
Mobile Home is a:
Double Wide
Year Built
2022
Width (Ft.In)
32
Length (Ft.In)
60
Driveway access to home:
Culvert Permit
Installation Decal #
89560
Septic #
22-0518
Setbacks Front
30'
Setback Side 1
25'
Setbacks Rear
25'
Dev Permit #
F023-
Setback Side 2
25'
Are you applying for a 5 year temporary permit?
No
Serial #
FL261-00P-H-A104965AB
Wind Zone?
2
Residential or Commercial Use?
Residential
Service Amps
200

Status & Review History

  1. Application pending.
  2. Point Review - Processing
  3. Point Review - Printed-Online Application
  4. Point Review - Reviewed
  5. Plan Review - Reviewed
  6. Zoning Review - Reviewed
  7. Final Review - Documents Required
  8. Final Review - Documents Required
  9. Final Review - Documents Required
  10. Final Review - Reviewed
  11. Final Review - Payment Needed
  12. Permit Issued

Contractors

  • Robert D Sheppard

    Melvins Mobile Home Service

    License
    IH1025386
    Title
    Mh Installer (ih)
    Role
    Contractor

    County License & Liability Insurance Expired.

  • Glenn Whittington

    Whittington Electric Inc

    License
    EC13002957
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Ronald E Bonds Sr

    Style Crest Inc

    License
    CAC1817658
    Title
    Class "b" A/c Contractor
    Role
    Contractor

    County License & State License Expired.

Inspections

  1. Dec 6, 2022

    Passed: Mobile Home - Mobile Home Set-Up Final

    Frame Bond Needs To Be Connected

    Inspected by Anthony Aslan

  2. Dec 6, 2022

    Passed: Engineering - Setbacks

    Inspected by Anthony Aslan

  3. Dec 9, 2022

    Septic Release Inspection

    Inspected by Health Dept

  4. Dec 13, 2022

    Release to power company

    Inspected by Anthony Aslan

  5. Dec 13, 2022

    Certificate-Release Certificate

    Rec'vd Picture

    Inspected by Anthony Aslan