Inspection |
Notes |
Performed By |
Date |
Passed: Engineering - Initial Driveway |
|
Smith, Blake |
6/14/2022 |
Passed: Building - Footer |
|
Matt Forsyth |
6/22/2022 |
Passed: Engineering - Setbacks |
|
Matt Forsyth |
6/22/2022 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Troy Crews |
7/13/2022 |
Passed: Building - Slab |
|
Troy Crews |
7/19/2022 |
Passed: Electrical - Temporary Service |
|
Troy Crews |
7/21/2022 |
Release to power company |
|
Troy Crews |
7/21/2022 |
Passed: Building - Roof Decking |
|
Matt Forsyth |
8/15/2022 |
Passed: Building - Wall Sheathing |
|
Matt Forsyth |
8/15/2022 |
Passed: Building - Framing |
|
Troy Crews |
9/1/2022 |
Passed: Electrical - 2nd Rough-In |
|
Troy Crews |
9/1/2022 |
Passed: Mechanical - Rough In |
|
Troy Crews |
9/1/2022 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Troy Crews |
9/1/2022 |
Passed: Building - Insulation |
Walls And Some Ceiling |
Matt Forsyth |
9/7/2022 |
Failed: Electrical - Permanent Power |
Undersized Bear Copper Ground Wire Septic And Drive Releases |
Matt Forsyth |
11/18/2022 |
Failed: Engineering - Final Driveway |
No Limerock Cover |
Smith, Blake |
11/21/2022 |
Passed: Electrical - Permanent Power |
Need Drive Release-- Do Not Issue Co Until Confirmation Rec'd From Sallie At Eh Even Though Septic Rec'd-- Mg |
Troy Crews |
11/22/2022 |
Septic Release Inspection |
Do Not Issue Co Until Confirmation Rec'd From Sallie At Eh Even Though Septic Rec'd-- Mg |
Health Dept |
11/22/2022 |
Passed: Engineering - Final Driveway |
Co Not To Be Given Until Driveway Is Complete |
Smith, Blake |
11/23/2022 |
Release to power company |
Do Not Issue Co Until Confirmation Rec'd From Sallie At Eh Even Though Septic Rec'd-- Mg |
Melissa Garber |
11/28/2022 |
Passed: Building - Final |
Waiting For Environmental Health--- Confirmation Rec'd 1/26/2023 |
Matt Forsyth |
1/23/2023 |
Release to power company |
|
Melissa Garber |
1/26/2023 |
Certificate-Release Certificate |
|
Matt Forsyth |
1/26/2023 |