| Application #: | 50361 |
| Permit #: |
000044660 |
| Related Permit: |
|
| Submitted: | Thursday, May 12, 2022 |
| Issued: | Thursday, June 23, 2022 |
| Expires: | Wednesday, December 21, 2022 |
| Completed: | |
| Status: |
Permit Reissued |
| Septic Release? |
Yes |
| Elevation regulation |
Minimum Requirement |
| Finished floor requirement |
One foot above the road |
| Fema map number |
12023C0513C |
| In floodway |
N |
| This is the construction of a |
Single Family Dwelling |
| Setbacks Front |
30' |
| Setback Side 1 |
25' |
| Setback Side 2 |
25' |
| Setbacks Rear |
25' |
| Stories |
1 |
| Heated Area (Sqft) |
792 |
| Total Area (Sqft) |
2160 |
| Building Code Construction Type |
V |
| Building Code Element |
B |
| Building Code Occupancy Types |
Residential |
| Occupancy Use Title |
single family dwelling |
| Building Code Edition |
2020 Florida Building Code 7th Edition and 2017 National Electrical Code |
| Septic# (00-0000) or (X00-000) |
22-0064 |
| Sealed roof decking options. (Must select one option per FBC 2023 8th Edition) |
a self-adhering polymer-modified bitumen underlayment complying with ASTM D1970 applied over the entire roof. |
| 8/25/2021 |
Application pending. |
| 5/12/2022 |
Point Review - Processing |
| 5/19/2022 |
Point Review - On Hold-Incomplete |
| 5/20/2022 |
Plan Review - Documents Required |
| 5/23/2022 |
Plan Review - On Hold-Incomplete |
| 5/27/2022 |
Point Review - Printed-Online Application |
| 5/27/2022 |
Point Review - Reviewed |
| 6/1/2022 |
Plan Review - Reviewed |
| 6/3/2022 |
Final Review - Corrections Needed |
| 6/3/2022 |
Final Review - Corrections Needed |
| 6/3/2022 |
Zoning Review - Reviewed |
| 6/6/2022 |
Final Review - Corrections Needed |
| 6/9/2022 |
Final Review - Reviewed |
| 6/9/2022 |
Final Review - Payment Needed |
| 6/10/2022 |
Permit Issued |
| 6/23/2022 |
Permit Reissued |
| Name / Business |
License |
Title |
Role |
Myca L Mustin Steel Buildings And Structures Inc
County License & State License & Liability Insurance & Workers Comp Expired. |
CBC1264061 |
Cert. Building |
Contractor |
| Inspection |
Notes |
Performed By |
Date |
| Septic Release Inspection |
|
Health Dept |
5/20/2022 |
| Passed: Building - Footer |
|
Troy Crews |
6/24/2022 |
| Passed: Engineering - Setbacks |
|
Troy Crews |
6/24/2022 |