Permit Details

Permit Search

Permit

New Residential Construction

1276 SW JASMINE ST
FORT WHITE, FL 32038

Permit #
000044657
Application #
54359
Status Completed
  1. Submitted May 4, 2022
  2. Issued Aug 1, 2022
  3. Expires Jul 11, 2023
  4. Completed Jan 13, 2023

Property

Parcel #
03816-412
Owner
Truntz Anthony S
Acres
10.10
Subdivision
Tustenuggee Trace Unr
Zoning
A-3
Flood zone
X
District
4

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Engineers Elevation Letter
Finished floor requirement
98.10'
Requirement needed
By Nailing Inspection
Document needed is
a Surveyor letter giving the Finished Floor Elevation
Document receieved
Yes
Fema map number
12023C0485C
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Stories
1
Heated Area (Sqft)
1969
Total Area (Sqft)
2882
Building Height
18
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000)
22-0367
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Point Review - Processing
  3. Point Review - Printed-Online Application
  4. Point Review - Reviewed
  5. Plan Review - Building Approved
  6. Plan Review - Electrical Approved
  7. Plan Review - Mechanical Approved
  8. Plan Review - Plumbing Approved
  9. Plan Review - Reviewed
  10. Zoning Review - Reviewed
  11. Final Review - Reviewed
  12. Final Review - Corrections Needed
  13. Final Review - Payment Needed
  14. Permit Issued
  15. Permit Reissued
  16. Final Review - Payment Needed

Contractors

  • Bryan Zecher

    Bryan Zecher Homes Inc

    License
    CBC1257343
    Title
    Building Contractor
    Role
    Contractor
  • Cody Barrs

    Barrs Plumbing Inc

    License
    CFC1427145
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Robert Ogles

    Ogles Roofing & Construction Llc

    License
    CCC1328699
    Title
    Cert Roofing
    Role
    Subcontractor

    County License & State License Expired.

  • Donald R Hollingsworth

    Holly Electric Inc

    License
    EC13005429
    Title
    Electrical
    Role
    Subcontractor
  • Anthony R Franks

    Franks & Lane Heating And Air Llc

    License
    CAC1818631
    Title
    Cert. A/c Class “b”
    Role
    Subcontractor

    County License & State License Expired.

Inspections

  1. Jun 21, 2022

    Passed: Building - Footer

    Inspected by Troy Crews

  2. Jun 21, 2022

    Passed: Engineering - Setbacks

    Inspected by Troy Crews

  3. Jun 24, 2022

    Passed: Electrical - Temporary Service

    Inspected by Troy Crews

  4. Jun 24, 2022

    Release to power company

    Inspected by Troy Crews

  5. Jul 11, 2022

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Troy Crews

  6. Jul 20, 2022

    Passed: Building - Monolithic Slab

    Inspected by Troy Crews

  7. Jul 20, 2022

    Passed: Engineering - Setbacks

    Inspected by Troy Crews

  8. Jul 20, 2022

    Cancelled: Building - Slab

    Inspected by Troy Crews

  9. Sep 9, 2022

    Passed: Building - Framing

    Inspected by Troy Crews

  10. Sep 9, 2022

    Passed: Building - Roof Decking

    Inspected by Troy Crews

  11. Sep 9, 2022

    Passed: Building - Wall Sheathing

    Inspected by Troy Crews

  12. Sep 9, 2022

    Passed: Electrical - 2nd Rough-In

    Inspected by Troy Crews

  13. Sep 9, 2022

    Passed: Mechanical - Rough In

    Inspected by Troy Crews

  14. Sep 9, 2022

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Troy Crews

  15. Sep 15, 2022

    Passed: Building - Insulation

    Inspected by Troy Crews

  16. Nov 16, 2022

    Passed: Electrical - Permanent Power

    Need Septic Final

    Inspected by Troy Crews

  17. Nov 21, 2022

    Release to power company

    Inspected by Melissa Garber

  18. Nov 21, 2022

    Septic Release Inspection

    Inspected by Health Dept

  19. Jan 12, 2023

    Passed: Building - Final

    Inspected by Troy Crews

Documents