Permit Details

Permit Search

Permit

New Residential Construction

1001 SW HILL CREEK DR
LAKE CITY, FL 32025

Permit #
000044656
Application #
54140
Status Completed
  1. Submitted May 24, 2022
  2. Issued Jun 10, 2022
  3. Expires Aug 14, 2023
  4. Completed Feb 15, 2023

Property

Parcel #
09116-113
Owner
Jordan Douglas A, Jordan Lucila
Acres
5.03
Subdivision
Hills At Rose Creek Phase 1
Zoning
PRRD
Flood zone
X
District
4

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0384D
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Stories
1
Heated Area (Sqft)
2460
Total Area (Sqft)
4008
Building Height
25
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000)
22-0418
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Point Review - Processing
  3. Point Review - Printed-Online Application
  4. Point Review - Reviewed
  5. Plan Review - Building Approved
  6. Plan Review - Electrical Approved
  7. Plan Review - Mechanical Approved
  8. Plan Review - Plumbing Approved
  9. Plan Review - Fuel/Gas Approved
  10. Plan Review - Reviewed
  11. Zoning Review - Reviewed
  12. Final Review - Reviewed
  13. Final Review - Reviewed
  14. Final Review - Payment Needed
  15. Permit Issued
  16. Final Review - Payment Needed
  17. Final Review - Payment Needed

Contractors

  • Bryan Zecher

    Bryan Zecher Homes Inc

    License
    CBC1257343
    Title
    Building Contractor
    Role
    Contractor
  • Cody Barrs

    Barrs Plumbing Inc

    License
    CFC1427145
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Robert Ogles

    Ogles Roofing & Construction Llc

    License
    CCC1328699
    Title
    Cert Roofing
    Role
    Subcontractor

    County License & State License Expired.

  • Donald R Hollingsworth

    Holly Electric Inc

    License
    EC13005429
    Title
    Electrical
    Role
    Subcontractor
  • Anthony R Franks

    Lane Heating & Air Llc

    License
    CAC1818631
    Title
    Cert. A/c Class “b”
    Role
    Subcontractor

    County License & State License Expired.

Inspections

  1. Jun 24, 2022

    Passed: Electrical - Temporary Service

    Inspected by Troy Crews

  2. Jun 24, 2022

    Release to power company

    Inspected by Troy Crews

  3. Jul 6, 2022

    Passed: Building - Footer

    Inspected by Troy Crews

  4. Jul 6, 2022

    Passed: Engineering - Setbacks

    Inspected by Troy Crews

  5. Aug 5, 2022

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Troy Crews

  6. Aug 16, 2022

    Passed: Building - Slab

    Inspected by Troy Crews

  7. Sep 14, 2022

    Passed: Building - Roof Decking

    Inspected by Troy Crews

  8. Sep 14, 2022

    Passed: Building - Wall Sheathing

    Inspected by Troy Crews

  9. Sep 15, 2022

    Cancelled: Building - Roof Decking

    Inspected by Troy Crews

  10. Sep 15, 2022

    Cancelled: Building - Wall Sheathing

    Inspected by Troy Crews

  11. Sep 19, 2022

    Passed: Building - Strapping

    Inspected by Troy Crews

  12. Sep 19, 2022

    Passed: Building - Framing

    Inspected by Troy Crews

  13. Oct 4, 2022

    Passed: Electrical - 2nd Rough-In

    Inspected by Troy Crews

  14. Oct 4, 2022

    Passed: Mechanical - Rough In

    Inspected by Troy Crews

  15. Oct 4, 2022

    Passed: Plumbing/Gas - 2nd Rough-In

    Gas Line Had 40 Lb. Test, Also Let Gas Provider Check.

    Inspected by Troy Crews

  16. Oct 13, 2022

    Passed: Building - Insulation

    Inspected by Troy Crews

  17. Dec 13, 2022

    Passed: Electrical - Permanent Power

    Need Septic And Driveway Final

    Inspected by Troy Crews

  18. Jan 11, 2023

    Release to power company

    Inspected by Melissa Garber

  19. Jan 11, 2023

    Septic Release Inspection

    Inspected by Health Dept

  20. Feb 15, 2023

    Passed: Building - Final

    Have Gas Suplier Do Final Startup And Checks.

    Inspected by Troy Crews

Documents