Permit Details

Permit Search

Permit

Additions

576 SW BRODERICK DR
LAKE CITY, FL 32025

Permit #
000044608
Application #
54667
Status Completed
  1. Submitted May 5, 2022
  2. Issued Jun 3, 2022
  3. Expires Sep 7, 2024
  4. Completed Mar 11, 2024

Property

Parcel #
08466-106
Owner
Bahr Michael, Bahr Shuwei
Acres
1.00
Subdivision
Saddle Of The South
Zoning
RSF-1
Flood zone
X
District
5

Permit

Status
Completed
Septic release
Not yet released
Related permit
—

Job Details

Elevation regulation
Existing Building
Finished floor requirement
Meet existing structure
Fema map number
12023C0293D
In floodway
N
Description of addition:
bedroom & covered patio
Select driveway access to property:
Existing Drive
Fire sprinklers?
No
Setbacks Front
25'
Setback Side 1
10'
Setback Side 2
10'
Setback Rear
15'
Stories
2
Heated Area (Sqft)
854
Total Area (Sqft)
854
Total Estimated Cost
35000
Building Height
22
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Dev Permit #
F023-
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic#
21-0062
Is this an addition for commercial or residential use?
Residential
Sealed roof decking options. (Must select one.)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.

Status & Review History

  1. City of Lake City Notified of Application within Utility Service Areas LC_GAS,.
  2. Point Review - Received-Hard Copy Application
  3. Plan Review - Documents Required
  4. Zoning Review - Reviewed
  5. City of Lake City
  6. Plan Review - Documents Required
  7. Plan Review - Documents Required
  8. Plan Review - Corrections Needed
  9. Plan Review - Corrections Needed
  10. Plan Review - Building Approved
  11. Plan Review - Electrical Approved
  12. Plan Review - Mechanical Approved
  13. Plan Review - Plumbing Approved
  14. Plan Review - Reviewed
  15. Final Review - Reviewed
  16. Final Review - Reviewed
  17. Final Review - Payment Needed
  18. Final Review - Payment Needed
  19. Permit Issued

Contractors

This is an owner-builder project.

  • Darin L Summerlin

    Summerlin Roofing Inc

    License
    CCC1326192
    Title
    Roofing Contractor
    Role
    Subcontractor

Inspections

  1. Aug 1, 2022

    Passed: Building - Roof Decking

    Inspected by Matt Forsyth

  2. Aug 1, 2022

    Passed: Building - Monolithic Slab

    Reviewed Pictures From Home Owner Of Foundation

    Inspected by Matt Forsyth

  3. Aug 1, 2022

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  4. Aug 1, 2022

    Passed: Building - Wall Sheathing

    Inspected by Matt Forsyth

  5. Nov 28, 2022

    Passed: Building - Framing

    Inspected by Matt Forsyth

  6. Jan 20, 2023

    Failed: Building - Insulation

    Not Complete

    Inspected by Matt Forsyth

  7. Mar 15, 2023

    Passed: Electrical - Above Ceiling

    Inspected by Matt Forsyth

  8. Apr 14, 2023

    Passed: Electrical - Above Ceiling

    Inspected by Matt Forsyth

  9. Apr 14, 2023

    Passed: Plumbing/Gas - Water Pipe

    Inspected by Matt Forsyth

  10. Nov 14, 2023

    Passed: Engineering - Spot Check

    Inspected by Matt Forsyth

  11. Jan 5, 2024

    Passed: Electrical - 2nd Rough-In

    Inspected by Matt Forsyth

  12. Jan 5, 2024

    Passed: Mechanical - Rough In

    Inspected by Matt Forsyth

  13. Jan 5, 2024

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Matt Forsyth

  14. Feb 22, 2024

    Passed: Building - Insulation

    Inspected by Matt Forsyth

  15. Mar 11, 2024

    Passed: Building - Final

    Inspected by Matt Forsyth

  16. Mar 11, 2024

    Passed: Electrical - Permanent Power

    Inspected by Matt Forsyth

  17. Mar 11, 2024

    Release to power company

    Inspected by Matt Forsyth

  18. Requested

    Electrical - 2nd Rough-In

    Awaiting inspection

  19. Requested

    Mechanical - Rough In

    Awaiting inspection

  20. Requested

    Plumbing/Gas - 2nd Rough-In

    Awaiting inspection