| Inspection |
Notes |
Performed By |
Date |
| Passed: Building - Footer |
|
Troy Crews |
6/15/2022 |
| Passed: Engineering - Setbacks |
|
Troy Crews |
6/15/2022 |
| Septic Release Inspection |
|
Health Dept |
7/12/2022 |
| Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Troy Crews |
7/18/2022 |
| Passed: Building - Slab |
|
Anthony Aslan |
7/26/2022 |
| Cancelled: Building - Roof Decking |
Rescheduled |
Emaleigh Williams |
8/19/2022 |
| Cancelled: Building - Wall Sheathing |
Rescheduled |
Emaleigh Williams |
8/19/2022 |
| Cancelled: Building - Roof Decking |
Rescheduled |
Emaleigh Williams |
8/22/2022 |
| Cancelled: Building - Wall Sheathing |
Rescheduled |
Emaleigh Williams |
8/22/2022 |
| Passed: Building - Roof Decking |
|
Troy Crews |
8/23/2022 |
| Passed: Building - Wall Sheathing |
Gable Flat Straps Are On Outside Of Gable Ends Done. |
Troy Crews |
8/23/2022 |
| Failed: Building - Framing |
A-07 Truss Broken At Heal Back Porch Repair Needed, Check And Tighten All Of The All Thread Rods As Needed. |
Troy Crews |
10/10/2022 |
| Passed: Electrical - 2nd Rough-In |
|
Troy Crews |
10/10/2022 |
| Failed: Mechanical - Rough In |
Dryer Vent Pipe Loose At Roof Connection. |
Troy Crews |
10/10/2022 |
| Passed: Plumbing/Gas - 2nd Rough-In |
Gas Line 18 Psi Test, Have Gas Company Do Test Also. |
Troy Crews |
10/10/2022 |
| Passed: Building - Insulation |
|
Troy Crews |
10/24/2022 |
| Passed: Building - Framing |
Repair Made |
Troy Crews |
10/24/2022 |
| Passed: Mechanical - Rough In |
Repair Made |
Troy Crews |
10/24/2022 |
| Passed: Electrical - Permanent Power |
|
Troy Crews |
1/18/2023 |
| Passed: Building - Final |
Ac Unit To Be Repaired Under Warranty Per Contractor. |
Troy Crews |
2/28/2023 |