| Septic Release Inspection |
|
Health Dept |
3/16/2022 |
| Passed: Plumbing/Gas - 1st Underground Rough–In |
Waste Lines Only |
Troy Crews |
5/20/2022 |
| Passed: Building - Monolithic Slab |
|
Troy Crews |
5/25/2022 |
| Passed: Engineering - Setbacks |
|
Troy Crews |
5/25/2022 |
| Passed: Building - Wall Sheathing |
|
Matt Forsyth |
6/24/2022 |
| Passed: Building - Wall Sheathing |
|
Matt Forsyth |
6/24/2022 |
| Failed: Building - Framing |
Need Strapping Tying Floors Together Upper And Lower Also Missing A Few Anchor Bolts |
Matt Forsyth |
8/17/2022 |
| Passed: Electrical - 2nd Rough-In |
|
Matt Forsyth |
8/17/2022 |
| Cancelled: Mechanical - Rough In |
|
Matt Forsyth |
8/17/2022 |
| Failed: Plumbing/Gas - Tub Set/Shower Pan |
Need Water In Tubs For Water Test , Water Supply Has No Pressure Also Shower Pan Needed |
Matt Forsyth |
8/17/2022 |
| Passed: Building - Framing |
|
Matt Forsyth |
8/26/2022 |
| Passed: Mechanical - Rough In |
Need Gaskets On Boots Will Check At Insulation Inspection |
Matt Forsyth |
8/26/2022 |
| Passed: Plumbing/Gas - 2nd Rough-In |
All Tubs Water Tested |
Matt Forsyth |
8/26/2022 |
| Passed: Building - Insulation |
Walls And Partial Ceiling Prepped For Blown Insulation |
Matt Forsyth |
9/1/2022 |
| Passed: Electrical - Permanent Power |
|
Matt Forsyth |
11/29/2022 |
| Release to power company |
|
Matt Forsyth |
11/29/2022 |
| Failed: Building - Final |
Stair Ballusters Do Not Meet 4 Inch Sphere Requirement |
Matt Forsyth |
2/3/2023 |
| Failed: Building - Final |
Fbc R312.1.3 |
Matt Forsyth |
2/9/2023 |
| Passed: Building - Final |
|
Matt Forsyth |
2/13/2023 |