Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Mobile Home Permit
Address 631 SW MARIGOLD PL
FORT WHITE, FL 32038
Parcel #: 09696-109
Acres: 10.00
Owner: Hathan Raphat Shwy
Subdivision: Tustenuggee Plantation Unit 1 Unr
Zoning: A-3
Flood Zone: X
District: 4
Application #: 54243
Permit #: 000044456
Related Permit:
Submitted: Monday, April 4, 2022
Issued: Tuesday, May 17, 2022
Expires: Friday, June 24, 2022
Completed: Friday, June 24, 2022
Status: Completed
Septic Release? Yes
Notes:

Job Details
Mobile Home is a: Double Wide
Year Built 2010
Width (Ft.In) 32
Length (Ft.In) 60
Wind Zone? 2
Serial # fla81175ab
Installation Decal # 89016
Residential or Commercial Use? Residential
Driveway access to home: Existing Drive
Are you applying for a 5 year temporary permit? No
Septic # (00-0000) or (X00-000) 22-0245
Dev Permit # F023-
Setbacks Front 30'
Setback Side 1 25'
Setback Side 2 25'
Setbacks Rear 25'
Elevation regulation Minimum Requirement
Finished floor requirement One foot above the road
Fema map number 12023C0485C
In floodway N
Review Notes
4/5/2022 Point Review - Printed-Online Application NEEDED: *POWER COMPANY *ENV HEALTH SIGNED SITE PLAN APPROVAL-- CONTACT 386-758-1058 *DATA PLATE *911 ADDRESS CONFIRMED-- CONFIRM ACCESS POINT (DRIVEWAY SHOWS OFF MARIGOLD), AS WE HAVE DIFFERENT ADDRESS THAN WHAT GIVEN
4/5/2022 Point Review - Reviewed NEEDED: *POWER COMPANY *ENV HEALTH SIGNED SITE PLAN APPROVAL-- CONTACT 386-758-1058 *DATA PLATE *911 ADDRESS CONFIRMED-- CONFIRM ACCESS POINT (DRIVEWAY SHOWS OFF MARIGOLD), AS WE HAVE DIFFERENT ADDRESS THAN WHAT GIVEN
4/5/2022 Plan Review - Reviewed NEEDED: *POWER COMPANY *ENV HEALTH SIGNED SITE PLAN APPROVAL-- CONTACT 386-758-1058 *DATA PLATE *911 ADDRESS CONFIRMED-- CONFIRM ACCESS POINT (DRIVEWAY SHOWS OFF MARIGOLD), AS WE HAVE DIFFERENT ADDRESS THAN WHAT GIVEN
4/6/2022 Zoning Review - Reviewed NEEDED: *POWER COMPANY *ENV HEALTH SIGNED SITE PLAN APPROVAL-- CONTACT 386-758-1058 *DATA PLATE *911 ADDRESS CONFIRMED-- CONFIRM ACCESS POINT (DRIVEWAY SHOWS OFF MARIGOLD), AS WE HAVE DIFFERENT ADDRESS THAN WHAT GIVEN
4/7/2022 Zoning Review - Reviewed NEEDED: *ENV HEALTH SIGNED SITE PLAN APPROVAL-- CONTACT 386-758-1058 *911 ADDRESS CONFIRMED-- CONFIRM ACCESS POINT (DRIVEWAY SHOWS OFF MARIGOLD), AS WE HAVE DIFFERENT ADDRESS THAN WHAT GIVEN
4/7/2022 Final Review - Documents Required NEEDED: *ENV HEALTH SIGNED SITE PLAN APPROVAL-- CONTACT 386-758-1058 *911 ADDRESS CONFIRMED-- CONFIRM ACCESS POINT (DRIVEWAY SHOWS OFF MARIGOLD), AS WE HAVE DIFFERENT ADDRESS THAN WHAT GIVEN
4/13/2022 Final Review - Documents Required NEEDED: *ENV HEALTH SIGNED SITE PLAN APPROVAL-- CONTACT 386-758-1058
5/16/2022 Final Review - Payment Needed
5/17/2022 Permit Issued Permit #000044456 created and approved.
Contractors
Name/ Business License Title Role
Glenn M Williams Jr
North Fl Mobile Home Installers Llc
IH1054858 Mh Installer (ih) Contractor
Inspections
Inspection Notes Performed By Date
Passed: Mobile Home - In County Pre-Mobile Home before set-up Zone 2 In Master Closet Troy Crews 4/6/2022
Septic Release Inspection Health Dept 5/16/2022
Failed: Mobile Home - Mobile Home Set-Up Final Need Steps, Need To Complete Power To Well, Get Ductwork 4 Inches Off Ground Troy Crews 5/18/2022
Passed: Engineering - Setbacks Troy Crews 5/18/2022
Cancelled: Mobile Home - Mobile Home Set-Up Final Emaleigh Williams 6/9/2022
Cancelled: Engineering - Setbacks Emaleigh Williams 6/9/2022
Failed: Mobile Home - Mobile Home Set-Up Final No Steps Gate Locked Troy Crews 6/17/2022
Passed: Engineering - Setbacks Troy Crews 6/17/2022
Passed: Mobile Home - Mobile Home Set-Up Final Troy Crews 6/24/2022
Release to power company Troy Crews 6/24/2022
Passed: Engineering - Setbacks Troy Crews 6/24/2022