Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 297 SW KIMBERLY LN
LAKE CITY, FL 32024
Parcel #: 03026-109
Acres: 1.02
Owner: Under All Llc
Subdivision: Kimberly Oaks
Zoning: RR
Flood Zone: X
District: 3
Application #: 54324
Permit #: 000044450
Related Permit: Culvert: 000044443
Submitted: Monday, April 11, 2022
Issued: Monday, May 16, 2022
Expires: Wednesday, January 25, 2023
Completed: Wednesday, January 25, 2023
Status: Completed
Septic Release? Yes
Notes:
ELEVATION CONFIRMATION REC'D @ 100.78'
Job Details
Elevation regulation Subdivision Plat
Finished floor requirement 100'
Requirement needed By Nailing Inspection
Document needed is a Surveyor letter giving the Finished Floor Elevation
Document receieved Yes
Fema map number 12023C0289D
In floodway N
This is the construction of a Single Family Dwelling
Setbacks Front 25'
Setback Side 1 10'
Setback Side 2 10'
Setbacks Rear 15'
Stories 1
Heated Area (Sqft) 2105
Total Area (Sqft) 2807
Building Height 18
Building Code Construction Type V
Building Code Element B
Building Code Occupancy Types Residential
Occupancy Use Title single family
Building Code Edition 2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000) 22-0380
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition) two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Service Amps 200
Review Notes
4/11/2022 Point Review - Received-Hard Copy Application
4/18/2022 Plan Review - Building Approved
4/18/2022 Plan Review - Electrical Approved
4/18/2022 Plan Review - Mechanical Approved
4/18/2022 Plan Review - Plumbing Approved
4/18/2022 Plan Review - Fuel/Gas Approved
4/18/2022 Plan Review - Reviewed
4/20/2022 Zoning Review - Reviewed
5/6/2022 Plan Review - Documents Required
5/9/2022 Plan Review - Reviewed
5/10/2022 Zoning Review - Reviewed
5/10/2022 Final Review - Documents Required
5/13/2022 Final Review - Payment Needed
5/16/2022 Permit Issued
10/18/2022 Final Review - Payment Needed
Contractors
Name/ Business License Title Role
Mark Bauer
Gibraltar Contracting Llc
CBC1259633 Cert Building Contractor
Ryan C Beville
Rbi Electrical Contracting Llc
EC13004236 Electrical Contractor Subcontractor
Jeffrey Bokor
Dwc Contracting Llc
CCC1329756 Roofing Contractor Subcontractor
Clinton G Wilson
Wilson Heat & Air Inc
CAC057886 Class B A/c Subcontractor
James Butler Jr
Butler Plumbing Of Gainesville Inc
CFC057960 Plumbing Contractor Subcontractor
Inspections
Inspection Notes Performed By Date
Cancelled: Building - Footer Melissa Garber 5/17/2022
Cancelled: Engineering - Setbacks Melissa Garber 5/17/2022
Passed: Building - Footer Matt Forsyth 5/19/2022
Passed: Engineering - Setbacks Matt Forsyth 5/19/2022
Passed: Engineering - Initial Driveway Smith, Blake 5/31/2022
Passed: Plumbing/Gas - 1st Underground Rough–In Matt Forsyth 6/8/2022
Passed: Building - Slab Bait System For Termites Matt Forsyth 6/10/2022
Passed: Electrical - Temporary Service Matt Forsyth 6/14/2022
Release to power company Matt Forsyth 6/14/2022
Release to power company Changed Power Company From Fpl To Clay Melissa Garber 6/28/2022
Passed: Building - Roof Decking Matt Forsyth 7/15/2022
Passed: Building - Wall Sheathing Matt Forsyth 7/15/2022
Cancelled: Building - Slab Matt Forsyth 7/15/2022
Cancelled: Building - Slab Troy Crews 7/19/2022
Passed: Building - Framing Troy Crews 7/22/2022
Passed: Electrical - 2nd Rough-In Troy Crews 7/22/2022
Passed: Mechanical - Rough In Troy Crews 7/22/2022
Passed: Plumbing/Gas - 2nd Rough-In Troy Crews 7/22/2022
Passed: Building - Insulation Walls Matt Forsyth 8/1/2022
Septic Release Inspection Health Dept 9/28/2022
Passed: Electrical - Permanent Power Need Driveway rec'd 10.25.22 Matt Forsyth 10/20/2022
Passed: Engineering - Final Driveway Smith, Blake 10/25/2022
Release to power company Driveway Final Rec'd. Matt Forsyth 10/26/2022
Failed: Building - Final Breaker Panel Not Labeled Correctly Matt Forsyth 12/28/2022
Passed: Building - Final Item Addressed Matt Forsyth 1/25/2023
Documents
File Name Date File Size