Permit Details

Permit Search

Permit

New Residential Construction

1232 SW HIGH FIELD TER
LAKE CITY, FL 32024

Permit #
000044430
Application #
53863
Status Completed
  1. Submitted Mar 25, 2022
  2. Issued May 16, 2022
  3. Expires May 31, 2023
  4. Completed Dec 2, 2022

Property

Parcel #
03761-156
Owner
James Hiett
Acres
5.00
Subdivision
Meadowlands Phase 4
Zoning
A-3
Flood zone
X
District
4

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0395C
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
30
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Stories
1
Heated Area (Sqft)
1922
Total Area (Sqft)
2740
Building Height
21
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000)
22-0209
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Point Review - On Hold-Incomplete
  3. Plan Review - Building Approved
  4. Plan Review - Electrical Approved
  5. Plan Review - Mechanical Approved
  6. Plan Review - Plumbing Approved
  7. Plan Review - Reviewed
  8. Zoning Review - Reviewed
  9. Zoning Review - Reviewed
  10. Final Review - Reviewed
  11. Final Review - Reviewed
  12. Final Review - Corrections Needed
  13. Final Review - Documents Required
  14. Final Review - Reviewed
  15. Final Review - Payment Needed
  16. Permit Issued
  17. Final Review - Payment Needed

Contractors

  • Bryan Zecher

    Bryan Zecher Construction Inc

    License
    CBC054575
    Title
    Cert.building Contractor
    Role
    Contractor
  • Cody Barrs

    Barrs Plumbing Inc

    License
    CFC1427145
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Robert Ogles

    Ogles Roofing & Construction Llc

    License
    CCC1328699
    Title
    Cert Roofing
    Role
    Subcontractor

    County License & State License Expired.

  • Donald R Hollingsworth

    Holly Electric Inc

    License
    EC13005429
    Title
    Electrical
    Role
    Subcontractor
  • Anthony R Franks

    Franks & Lane Heating And Air Llc

    License
    CAC1818631
    Title
    Cert. A/c Class “b”
    Role
    Subcontractor

    County License & State License Expired.

Inspections

  1. May 24, 2022

    Passed: Building - Footer

    Inspected by Troy Crews

  2. May 24, 2022

    Passed: Engineering - Setbacks

    Inspected by Troy Crews

  3. May 24, 2022

    Passed: Electrical - Temporary Service

    Inspected by Troy Crews

  4. May 24, 2022

    Release to power company

    Inspected by Troy Crews

  5. Jun 16, 2022

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Troy Crews

  6. Jun 29, 2022

    Passed: Building - Slab

    Inspected by Troy Crews

  7. Jul 26, 2022

    Passed: Building - Ext Strapping/Wall Sheathing

    Inspected by Anthony Aslan

  8. Jul 26, 2022

    Passed: Building - Roof Decking

    Inspected by Anthony Aslan

  9. Jul 26, 2022

    Cancelled: Building - Wall Sheathing

    Inspected by Anthony Aslan

  10. Jul 29, 2022

    Passed: Building - Framing

    D02 One Piece Engineering Missing, D07 Needs One More H2.5 @ Each End

    Inspected by Anthony Aslan

  11. Aug 12, 2022

    Passed: Electrical - 2nd Rough-In

    Reminder Chase Pipes For Circuits At Panel Not To Exceed 24 Inches In Length.

    Inspected by Troy Crews

  12. Aug 12, 2022

    Failed: Mechanical - Rough In

    Duct At Air Handler Location Not Complete.

    Inspected by Troy Crews

  13. Aug 12, 2022

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Troy Crews

  14. Aug 22, 2022

    Passed: Building - Insulation

    Inspected by Troy Crews

  15. Aug 22, 2022

    Passed: Mechanical - Rough In

    Inspected by Troy Crews

  16. Oct 28, 2022

    Passed: Electrical - Permanent Power

    Need Septic Final And Driveway Final

    Inspected by Troy Crews

  17. Nov 8, 2022

    Release to power company

    Rec'd Final Drive And Septic

    Inspected by Troy Crews

  18. Nov 9, 2022

    Septic Release Inspection

    Inspected by Health Dept

  19. Dec 2, 2022

    Passed: Building - Final

    Inspected by Troy Crews

Documents