Inspection |
Notes |
Performed By |
Date |
Septic Release Inspection |
|
Health Dept |
3/22/2022 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Anthony Aslan |
6/10/2022 |
Cancelled: Building - Slab |
|
Anthony Aslan |
6/27/2022 |
Passed: Engineering - Setbacks |
|
Anthony Aslan |
6/27/2022 |
Passed: Building - Monolithic Slab |
|
Anthony Aslan |
6/27/2022 |
Passed: Building - Roof Decking |
|
Anthony Aslan |
7/18/2022 |
Passed: Building - Wall Sheathing |
|
Anthony Aslan |
7/18/2022 |
Passed: Building - Strapping |
|
Anthony Aslan |
7/25/2022 |
Failed: Building - Framing |
Missing Anchors At Bottom Splices, In Corners, Stud Pack Missing Under Double Girder |
Anthony Aslan |
7/25/2022 |
Failed: Electrical - 2nd Rough-In |
Need Nail Plate Top Above Panel Box |
Matt Forsyth |
8/5/2022 |
Failed: Mechanical - Rough In |
Need Gaskets On Boots And Nailplate Top Dryer Vent |
Matt Forsyth |
8/5/2022 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Matt Forsyth |
8/5/2022 |
Passed: Plumbing/Gas - Tub Set/Shower Pan |
Tub And Shower Pan |
Matt Forsyth |
8/5/2022 |
Failed: Building - Framing |
Missing Anchors At Bottom Splices, In Corners, Stud Pack Missing Under Double Girder, Also Garage Interior Wall Is Bearing. Anchor Behind Tub And Shower Pan. Do Not Insulate |
Anthony Aslan |
8/16/2022 |
Failed: Building - Strapping |
Until Passed Framing |
Anthony Aslan |
8/16/2022 |
Failed: Electrical - 2nd Rough-In |
Until Passed Framing |
Anthony Aslan |
8/16/2022 |
Failed: Mechanical - Rough In |
Until Passed Framing |
Anthony Aslan |
8/16/2022 |
Passed: Building - Framing |
Corrections Made |
Anthony Aslan |
8/18/2022 |
Passed: Building - Strapping |
Corrections Made |
Anthony Aslan |
8/18/2022 |
Passed: Electrical - 2nd Rough-In |
|
Anthony Aslan |
8/18/2022 |
Passed: Mechanical - Rough In |
|
Anthony Aslan |
8/18/2022 |
Passed: Building - Insulation |
Walls Only Could Not Find Any Attic Access Opening |
Matt Forsyth |
8/23/2022 |
Failed: Electrical - Permanent Power |
Per Troy Need Documentation From Power Company That They Are Moving Existing Temp Meter To House. |
Anthony Aslan |
12/7/2022 |
Passed: Electrical - Permanent Power |
|
Anthony Aslan |
1/4/2023 |
Release to power company |
|
Anthony Aslan |
1/4/2023 |
Cancelled: Building - Footer |
|
Anthony Aslan |
1/31/2023 |
Cancelled: Engineering - Setbacks |
|
Anthony Aslan |
1/31/2023 |
Passed: Building - Final |
Need Lock Out On Ahu Breaker Or Disconnect In Ahu Closet |
Anthony Aslan |
1/31/2023 |
Certificate-Release Certificate |
Recv'd Picture |
Anthony Aslan |
2/8/2023 |