Mobile Home
Permit
| Application #: | 53866 |
| Permit #: |
000044352 |
| Related Permit: |
|
| Submitted: | Tuesday, March 8, 2022 |
| Issued: | Monday, May 9, 2022 |
| Expires: | Monday, July 25, 2022 |
| Completed: | Monday, July 25, 2022 |
| Status: |
Completed |
| Septic Release? |
Yes |
Job Details
| Elevation regulation |
Minimum Requirement |
| Finished floor requirement |
One foot above the road |
| Fema map number |
12023C0195D |
| In floodway |
N |
| Mobile Home is a: |
Triple Wide |
| Year Built |
2022 |
| Width (Ft.In) |
45 |
| Length (Ft.In) |
76 |
| Driveway access to home: |
Culvert Permit |
| Installation Decal # |
86628 |
| Septic # |
22-0354 |
| Setbacks Front |
30' |
| Setback Side 1 |
25' |
| Setbacks Rear |
25' |
| Dev Permit # |
F023- |
| Setback Side 2 |
25' |
| Are you applying for a 5 year temporary permit? |
No |
| Serial # |
LOHGA1002574ABC |
| Wind Zone? |
2 |
| Residential or Commercial Use? |
Residential |
| Service Amps |
200 |
Review Notes
| 3/8/2022 |
Application pending. |
| 3/8/2022 |
Point Review - Printed-Online Application |
| 3/9/2022 |
Plan Review - Reviewed |
| 3/15/2022 |
Zoning Review - Reviewed |
| 3/16/2022 |
Final Review - Documents Required |
| 3/16/2022 |
Final Review - Documents Required |
| 3/19/2022 |
Final Review - Documents Required |
| 4/6/2022 |
Plan Review - Reviewed |
| 4/13/2022 |
Final Review - Documents Required |
| 5/5/2022 |
Final Review - Payment Needed |
| 5/5/2022 |
Permit Issued |
| 5/9/2022 |
Plan Review - Reviewed |
| 5/9/2022 |
Final Review - Payment Needed |
| 5/9/2022 |
Permit Reissued |
Contractors
| Name / Business |
License |
Title |
Role |
James D Williams Affordable Electrical Services Inc
|
EC13007092 |
Electrical Contractor |
Subcontractor |
Michael A Boland Ace A/c Of Ocala Llc
|
CAC1817716 |
Cert Class B A/c |
Subcontractor |
Brent M Strickland
|
IH1104218 |
Mh Installer (ih) |
Contractor |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Failed: Mobile Home - Mobile Home Set-Up Final |
Duct Work On Ground, Need Septic And Drive Final |
Troy Crews |
7/12/2022 |
| Passed: Engineering - Setbacks |
|
Troy Crews |
7/12/2022 |
| Septic Release Inspection |
|
Health Dept |
7/19/2022 |
| Passed: Engineering - Setbacks |
|
Anthony Aslan |
7/25/2022 |
| Passed: Mobile Home - Mobile Home Set-Up Final |
Duct Off Ground |
Anthony Aslan |
7/25/2022 |
| Release to power company |
|
Anthony Aslan |
7/25/2022 |