| Inspection |
Notes |
Performed By |
Date |
| Passed: Building - Footer |
|
Matt Forsyth |
5/5/2022 |
| Passed: Engineering - Setbacks |
|
Matt Forsyth |
5/5/2022 |
| Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Matt Forsyth |
6/2/2022 |
| Passed: Building - Slab |
|
Matt Forsyth |
6/17/2022 |
| Cancelled: Building - Framing |
|
Troy Crews |
7/22/2022 |
| Passed: Building - Roof Decking |
|
Troy Crews |
7/22/2022 |
| Passed: Building - Ext Strapping/Wall Sheathing |
|
Troy Crews |
7/22/2022 |
| Passed: Electrical - Temporary Service |
Need Waterproof Cover For Temporary Receptacle |
Matt Forsyth |
7/27/2022 |
| Release to power company |
|
Matt Forsyth |
7/27/2022 |
| Passed: Building - Lath/Stucco |
|
Matt Forsyth |
9/14/2022 |
| Failed: Electrical - 2nd Rough-In |
Pigtails Need To Be Installed In Boxes Some Romex Hanging Down Below Ceiling Need Staples |
Matt Forsyth |
9/14/2022 |
| Passed: Plumbing/Gas - 2nd Rough-In |
|
Matt Forsyth |
9/14/2022 |
| Passed: Electrical - 2nd Rough-In |
|
Matt Forsyth |
9/16/2022 |
| Passed: Mechanical - Rough In |
|
Matt Forsyth |
9/19/2022 |
| Passed: Building - Insulation |
Walls Only |
Matt Forsyth |
9/26/2022 |
| Passed: Electrical - Permanent Power |
Septic @ Driveway |
Matt Forsyth |
3/17/2023 |
| Septic Release Inspection |
|
Health Dept |
3/17/2023 |
| Release to power company |
|
Melissa Garber |
3/20/2023 |
| Passed: Engineering - Initial Driveway |
|
Smith, Blake |
3/20/2023 |
| Passed: Engineering - Final Driveway |
|
Smith, Blake |
3/20/2023 |
| Passed: Building - Final |
Front And Back Porch Need Ground Fault Protection On Receptacles |
Matt Forsyth |
5/16/2023 |
| Certificate-Release Certificate |
|
Matt Forsyth |
4/12/2024 |
| (Requested) Building-Pre-Certificate Public Works Inspection |
|
|
|