Permit Details

Permit Search

Permit

New Residential Construction

128 SW CAPTAINS GLN
LAKE CITY, FL 32025

Permit #
000044289
Application #
53257
Status Completed
  1. Submitted Feb 2, 2022
  2. Issued Sep 13, 2022
  3. Expires Aug 5, 2023
  4. Completed Feb 15, 2023

Property

Parcel #
02935-206
Owner
Canter Roy G & Teresa L Living Trust
Acres
2.26
Subdivision
Cannon Creek Est Replat Lot 6
Zoning
RSF-2
Flood zone
AE
District
5

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Special Flood Hazard Area
Finished floor requirement
119.10' One foot above FEMA Map Elevation
Requirement needed
By Permanent Power Inspection
Document needed is
an Elevation Certificate for Finished Construction
Document receieved
Yes
Fema map number
0291D
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
25
Setback Side 1
10
Setback Side 2
10
Setbacks Rear
15
Stories
2
Heated Area (Sqft)
1200
Total Area (Sqft)
4800
Building Height
30
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000)
22-0123
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.

Status & Review History

  1. Application pending.
  2. Point Review - On Hold-Incomplete
  3. Point Review - Printed-Online Application
  4. Plan Review - Building Approved
  5. Plan Review - Electrical Approved
  6. Plan Review - Mechanical Approved
  7. Plan Review - Documents Required
  8. Plan Review - Building Approved
  9. Plan Review - Electrical Approved
  10. Plan Review - Mechanical Approved
  11. Plan Review - Plumbing Approved
  12. Plan Review - Reviewed
  13. Zoning Review - Corrections Needed
  14. Zoning Review - Corrections Needed
  15. Zoning Review - Reviewed
  16. Final Review - Documents Required
  17. Zoning Review - Reviewed
  18. Final Review - Reviewed
  19. Final Review - Payment Needed
  20. Permit Issued
  21. Permit Reissued
  22. Final Review - Payment Needed

Contractors

  • Tabitha M Sibel

    Rjh Construction

    License
    CGC1515388
    Title
    General Contractor
    Role
    Contractor

    County License & State License Expired.

  • Cody Barrs

    Barrs Plumbing Inc

    License
    CFC1427145
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Lyndon J Rainbolt

    Rainbolt Tech Services,air Stream

    License
    EC13001835
    Title
    Electrical Contractor
    Role
    Subcontractor

    County License & State License & Workers Comp Expired.

  • Tyler T Carrozza

    Superior Air Conditioning And Refrigeration, Inc

    License
    CAC1820526
    Title
    Cert. A/c Class “b”
    Role
    Subcontractor

    County License & State License & Liability Insurance & Workers Comp Expired.

Inspections

  1. May 13, 2022

    Passed: Building - Footer

    Inspected by Matt Forsyth

  2. May 13, 2022

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  3. Jun 9, 2022

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Waste Pipe For Upstairs Only

    Inspected by Matt Forsyth

  4. Jun 21, 2022

    Passed: Building - Footer

    Inspected by Matt Forsyth

  5. Jun 21, 2022

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  6. Aug 4, 2022

    Passed: Building - Roof Decking

    Check Shiners

    Inspected by Anthony Aslan

  7. Aug 4, 2022

    Failed: Building - Wall Sheathing

    No Nailed Off

    Inspected by Anthony Aslan

  8. Aug 10, 2022

    Passed: Building - Wall Sheathing

    Inspected by Matt Forsyth

  9. Aug 22, 2022

    Passed: Electrical - Temporary Service

    Inspected by Matt Forsyth

  10. Aug 22, 2022

    Release to power company

    Inspected by Matt Forsyth

  11. Sep 2, 2022

    Failed: Building - Framing

    Need Elevation Confirmation Prior To Further Inspections

    Inspected by Troy Crews

  12. Sep 2, 2022

    Failed: Plumbing/Gas - 1st Underground Rough–In

    Need Elevation Confirmation

    Inspected by Troy Crews

  13. Sep 14, 2022

    Passed: Building - Framing

    Inspected by Matt Forsyth

  14. Sep 14, 2022

    Failed: Plumbing/Gas - 2nd Rough-In

    Need Water Test On Upstairs Floor

    Inspected by Matt Forsyth

  15. Sep 15, 2022

    Passed: Electrical - 1st Underground Rough–In

    This Inspection Was The Second Rough

    Inspected by Matt Forsyth

  16. Sep 15, 2022

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Matt Forsyth

  17. Sep 20, 2022

    Passed: Building - Insulation

    Inspected by Matt Forsyth

  18. Nov 30, 2022

    Cancelled: Electrical - 2nd Rough-In

    Inspected by Matt Forsyth

  19. Dec 29, 2022

    Cancelled: Electrical - 2nd Rough-In

    Inspected by Matt Forsyth

  20. Dec 30, 2022

    Failed: Electrical - Permanent Power

    Need Door Securing Panel Box In Dwelling Before Releasing Power Antiseptic Release

    Inspected by Matt Forsyth

  21. Jan 5, 2023

    Passed: Electrical - Permanent Power

    Item Addressed

    Inspected by Matt Forsyth

  22. Jan 6, 2023

    Septic Release Inspection

    Inspected by Health Dept

  23. Jan 26, 2023

    Release to power company

    Inspected by Melissa Garber

  24. Feb 6, 2023

    Passed: Building - Final

    Waiting On Pictures Of Railing

    Inspected by Matt Forsyth

  25. Feb 15, 2023

    Certificate-Release Certificate

    Item Addressed

    Inspected by Matt Forsyth

Documents