| Finished floor requirement |
|
| Fema map number |
12023C0390C |
| What is the power service for? |
Storage Building |
| Other job details: |
Installation of 2-2-2-4 aluminum wire from the power pole to the shop. This will provide 100 amps of power to the sub panel inside the shop. Installation of 100 amp sub panel inside of the shop. |
| Power Company |
Clay Electric |
| Septic # (00-0000) or (X00-000) |
x22 |
| Electrical Code Edition |
2017 National Electrical Code |
| Number of requested AMPS for electrical service: |
100 |
| Is the power service? |
Upgrading Existing Service |
| Residential or Commercial? |
Residential |