Inspection |
Notes |
Performed By |
Date |
Septic Release Inspection |
|
Health Dept |
8/26/2021 |
Rescheduled 7/12/2022:Plumbing/Gas - 1st Underground Rough–In |
|
Troy Crews |
7/11/2022 |
Cancelled: Building - Slab |
|
Anthony Aslan |
7/12/2022 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Anthony Aslan |
7/12/2022 |
Passed: Building - Slab |
|
Anthony Aslan |
7/20/2022 |
Passed: Engineering - Spot Check |
Checked Setbacks |
Anthony Aslan |
1/5/2023 |
Passed: Engineering - Spot Check |
Checked Slab |
Anthony Aslan |
6/23/2023 |
Cancelled: Building - Roof Decking |
|
Gary Pitzer |
8/28/2023 |
Cancelled: Building - Wall Sheathing |
|
Gary Pitzer |
8/28/2023 |
Failed: Building - Framing |
Need Engineers Leter For Wind Post Anchors |
Gary Pitzer |
8/28/2023 |
Failed: Building - Strapping |
Need Engineers Lettler For Wind Post |
Gary Pitzer |
8/28/2023 |
Passed: Building - Footer |
|
Gary Pitzer |
12/12/2023 |
Passed: Engineering - Setbacks |
|
Gary Pitzer |
12/12/2023 |
Building-Framing |
Passed Per Eng Letter |
Gary Pitzer |
1/31/2024 |
Building-Strapping |
Passed Per Eng Letter |
Gary Pitzer |
1/31/2024 |
Passed: Electrical - Temporary Service |
|
Gary Pitzer |
1/31/2024 |
Release to power company |
|
Gary Pitzer |
1/31/2024 |
Passed: Building - Insulation |
Foam Walls And Roof Letter On File |
Gary Pitzer |
7/26/2024 |
Failed: Building - Framing |
1. Need Engineering For Cantilever Over 2 Ft, At Balcony 2. If The Interior Walls Are Not Tight To The Exterior At The Top Draft Stopping Shall Be Installed, 3.need Stairs Installed To Loft Area |
Gary Pitzer |
2/4/2025 |
Cancelled: Electrical - 2nd Rough-In |
|
Gary Pitzer |
2/5/2025 |
Rescheduled 2/14/2025:Electrical - 2nd Rough-In |
|
Neonta Anderson |
2/10/2025 |
Rescheduled 2/14/2025:Electrical - Above Ceiling |
|
Neonta Anderson |
2/10/2025 |
Passed: Building - Framing |
Letter Received, Corrections Made |
Anthony Aslan |
2/14/2025 |
Cancelled: Electrical - 2nd Rough-In |
|
Anthony Aslan |
2/14/2025 |
Passed: Electrical - 2nd Rough-In |
|
Anthony Aslan |
3/3/2025 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Anthony Aslan |
3/3/2025 |
Passed: Plumbing/Gas - Tub Set/Shower Pan |
|
Gary Pitzer |
4/22/2025 |
Passed: Electrical - Permanent Power |
|
Gary Pitzer |
4/22/2025 |
Release to power company |
|
Gary Pitzer |
4/22/2025 |
Passed: Building - Final |
Cannot Closed Permit Or Release Certificate Of Occupancy Due To Missing Required Documents. |
Gary Pitzer |
5/8/2025 |
Certificate-Release Certificate |
|
Gary Pitzer |
5/19/2025 |