Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 2054 SW SALEM RD
LAKE CITY, FL 32024
Parcel #: 00383-107
Acres: 5.00
Owner: Brinkley Lena, Brinkley Matthew
Subdivision: Sun Park Estates
Zoning: A-3
Flood Zone: X
District: 2
Application #: 53594
Permit #: 000044252
Related Permit: New Residential Construction: 000041447
Submitted: Saturday, February 19, 2022
Issued: Monday, April 25, 2022
Expires: Monday, October 10, 2022
Completed: Monday, October 10, 2022
Status: Completed
Septic Release? Yes
Notes:
FOUNDATION ONLY PERMIT #41447 COMPLETION OF SFD PERMIT #41770 NEW COMPLETION PERMIT TO OWNER STRUCTURAL REPAIRS INCLUDED
Job Details
Elevation regulation Minimum Requirement
Finished floor requirement One foot above the road
Fema map number 12023C0270C
This is the construction of a Single Family Dwelling
If Other, explain the use of the structure. completion of permit 41770
Heated Area (Sqft) 4000
Total Area (Sqft) 3600
Stories 2
Building Height 25
Building Code Occupancy Types Residential
Occupancy Use Title single family dwelling
Setbacks Front 30'
Setback Side 1 25'
Setback Side 2 25'
Setbacks Rear 25'
Septic# (00-0000) or (X00-000) 21-0026
Service Amps 200
Building Code Edition 2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition) Other (explain)
Sealed roof decking explanation for other option. part of the metal building
Review Notes
2/19/2022 Application pending.
2/19/2022 Final Review - Corrections Needed
3/8/2022 Point Review - Corrections Needed
3/8/2022 Plan Review - Documents Required
3/8/2022 Application Converted
3/22/2022 Point Review - Corrections Needed
3/25/2022 Plan Review - Documents Required
4/18/2022 Plan Review - Building Approved
4/18/2022 Plan Review - Reviewed
4/18/2022 Zoning Review - Reviewed
4/18/2022 Final Review - Reviewed
4/18/2022 Final Review - Payment Needed
4/25/2022 Permit Issued
5/9/2022 Final Review - Payment Needed
6/17/2022 Final Review - Corrections Needed
Contractors
Name/ Business License Title Role
Inspections
Inspection Notes Performed By Date
Septic Release Inspection Health Dept 3/9/2022
Passed: Building - Footer Inside Building Spread Footings For Masonry Wall Support Matt Forsyth 6/21/2022
Passed: Engineering - Setbacks Matt Forsyth 6/21/2022
Passed: Engineering - Spot Check Matt Forsyth 6/21/2022
Passed: Building - Insulation Matt Forsyth 6/24/2022
Passed: Building - Framing Temp Stairs' Matt Forsyth 6/24/2022
Passed: Electrical - 2nd Rough-In Matt Forsyth 6/24/2022
Passed: Mechanical - Rough In Matt Forsyth 6/24/2022
Passed: Plumbing/Gas - 2nd Rough-In Matt Forsyth 6/24/2022
Passed: Plumbing/Gas - Tub Set/Shower Pan Tubs Water Tested Matt Forsyth 6/24/2022
Passed: Electrical - Permanent Power Matt Forsyth 7/26/2022
Release to power company Matt Forsyth 7/26/2022
Rescheduled 10/10/2022:Building - Final Matt Forsyth 10/6/2022
Passed: Building - Final Upstairs Future Build Matt Forsyth 10/10/2022