Type Roofing Job |
Re-Cover - New Material over Existing |
Further Job Details (Explain if decking is being replaced and or Repairs are being done.) |
Roof recover, old system to remain coated modified bitumen system fastened through existing roof system and into the deck. GAF .60 mil TPO with 3oz poly mat separator sheet Mechanically fastened system through existing roof system and into the deck. |
Type of structure |
Commercial Building |
Commercial or Residential |
Commercial |
Roof Area (for this job) Sq Ft |
17600 |
No. of Stories |
1 |
Ventilation: |
Ridge Vent |
Flashing: |
Replace All |
Drip Edge: |
Replace All |
Valley Treatment: |
New Metal |
Roof Pitch |
Less than 2:12 |
Second Roof Pitch (if applicable) |
Less than 2:12 |
Any cable and/or race-way wiring located on or within the roof assembly? |
No |
Is the existing roof being removed? |
No |
Explain if not removing the existing roofing material? |
Roof recover, old system to remain coated modified bitumen system fastened through existing roof system and into the deck. |
Type of New Roofing Product |
Flat or Membrane type |
Florida Product Approval Number |
FL5296-R49 |
Product Manufacturer |
GAF |
Product Description |
TPO 60 mil |
Sealed roof decking options: (Must select an option.) |
Other (explain) |
Sealed roof decking explanation for other option. |
Roof recover, old system to remain coated modified bitumen system fastened through existing roof system and into the deck. |
Building Code Edition |
2020 Florida Building Code 7th Edition and Florida Statute 553.844 |
Fema map number |
12023C0505C |