| Inspection |
Notes |
Performed By |
Date |
| Passed: Electrical - 1st Underground Rough–In |
Make Sure We Have Clearance From Footer Steel |
Troy Crews |
4/21/2022 |
| Passed: Plumbing/Gas - 1st Underground Rough–In |
Need Water Test On Waste Lines At Slab Inspection. |
Troy Crews |
4/21/2022 |
| Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Troy Crews |
5/3/2022 |
| Passed: Building - Footer |
|
Troy Crews |
5/4/2022 |
| Passed: Engineering - Setbacks |
|
Troy Crews |
5/4/2022 |
| Passed: Building - Slab |
|
Troy Crews |
5/4/2022 |
| Passed: Electrical - 1st Underground Rough–In |
|
Troy Crews |
6/16/2022 |
| Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Troy Crews |
6/16/2022 |
| Passed: Building - Framing |
|
Troy Crews |
7/12/2022 |
| Passed: Electrical - Permanent Power |
Need Septic Final |
Troy Crews |
7/12/2022 |
| Release to power company |
Power Release Received From Env. Health |
Troy Crews |
7/14/2022 |
| Septic Release Inspection |
|
Health Dept |
7/19/2022 |
| Cancelled: Electrical - Temporary Service |
|
Troy Crews |
7/28/2022 |
| Passed: Building - Final |
Need Fire And Zoning Final |
Troy Crews |
8/3/2022 |
| Failed: Engineering - Zoning Final |
Prior To Zoning Approval And Certificate Of Occupancy, The Following Items Must Be Corrected. 1) All Dirt And Sediment Must Be Cleaned Out Of The Right-of-way, Ditch, And Culvert. 2) All Slopes Must Be Stabilized. 3) Landscaping Must Be Continually Water As Not To Die. |
Brandon Stubbs |
8/5/2022 |
| Cancelled: Fire - Fire Final |
|
Melissa Garber |
8/5/2022 |
| Cancelled: Fire - Fire Final |
|
Melissa Garber |
8/5/2022 |
| Cancelled: Fire - Plan Review |
|
Melissa Garber |
8/5/2022 |
| Failed: Fire - Fire Final |
Exit Signs Not Present |
|
8/5/2022 |
| Passed: Fire - Fire Final |
E-mail In File From Mr. Hill |
Troy Crews |
8/12/2022 |
| Passed: Engineering - Zoning Final |
Owner To Check With Jennifer Dubose On Erosion Problem And Repair. |
Troy Crews |
8/12/2022 |