Inspection |
Notes |
Performed By |
Date |
Passed: Building - Footer |
Partial Retaining Wall Foundation Southwest Corner |
Troy Crews |
9/7/2022 |
Passed: Engineering - Setbacks |
|
Troy Crews |
9/7/2022 |
Passed: Building - Footer |
First Pour Wall |
Troy Crews |
9/16/2022 |
Passed: Engineering - Setbacks |
|
Troy Crews |
9/16/2022 |
Passed: Building - Footer |
Partial Retaining And Building Footer. |
Troy Crews |
9/21/2022 |
Passed: Engineering - Setbacks |
|
Troy Crews |
9/21/2022 |
Passed: Building - Footer |
Wall Pour |
Troy Crews |
10/4/2022 |
Passed: Engineering - Setbacks |
|
Troy Crews |
10/4/2022 |
Passed: Building - Footer |
|
Troy Crews |
10/13/2022 |
Passed: Engineering - Setbacks |
|
Troy Crews |
10/13/2022 |
Passed: Building - Footer |
Partial Loading Dock And Partial Back Wall |
Troy Crews |
10/24/2022 |
Passed: Engineering - Setbacks |
|
Troy Crews |
10/24/2022 |
Passed: Building - Footer |
Northwest Corner And Partial North End |
Troy Crews |
11/2/2022 |
Passed: Engineering - Setbacks |
|
Troy Crews |
11/2/2022 |
Passed: Fire - Plan Review |
|
Dwight Boozer |
11/9/2022 |
Passed: Building - Footer |
|
Troy Crews |
12/1/2022 |
Passed: Engineering - Setbacks |
|
Troy Crews |
12/1/2022 |
Passed: Building - Footer |
|
Troy Crews |
12/21/2022 |
Passed: Engineering - Setbacks |
|
Troy Crews |
12/21/2022 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
Waste Lines Ancilliary Building |
Troy Crews |
12/29/2022 |
Passed: Building - Vertical Cells/Columns |
|
Troy Crews |
1/3/2023 |
Passed: Electrical - 1st Underground Rough–In |
Underground Strapped Off To Driven Unistrut |
Troy Crews |
1/4/2023 |
Passed: Building - Footer |
|
Troy Crews |
1/5/2023 |
Passed: Engineering - Setbacks |
|
Troy Crews |
1/5/2023 |
Passed: Building - Footer |
Column Pads |
Troy Crews |
1/11/2023 |
Passed: Engineering - Setbacks |
|
Troy Crews |
1/11/2023 |
Passed: Electrical - 1st Underground Rough–In |
|
Troy Crews |
1/11/2023 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Troy Crews |
1/17/2023 |
Passed: Building - Slab |
Main Building Slab |
Troy Crews |
1/24/2023 |
Passed: Building - Footer |
|
Troy Crews |
1/27/2023 |
Passed: Engineering - Setbacks |
|
Troy Crews |
1/27/2023 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
Storm Drain Rough In |
Troy Crews |
2/14/2023 |
Passed: Building - Slab |
|
Troy Crews |
2/22/2023 |
Cancelled: Mechanical - Rough In |
|
Troy Crews |
2/28/2023 |
Passed: Plumbing/Gas - Rain Leader |
Reminder Of Rain Leaders For Ancillary Building |
Troy Crews |
2/28/2023 |
Passed: Plumbing/Gas - Sanitary |
Main Copper Water Line Pressure Test Of 160 |
Troy Crews |
2/28/2023 |
Passed: Building - Framing |
Also Window Frames |
Troy Crews |
3/9/2023 |
Cancelled: Building - Rated Assembly Fastening |
|
Troy Crews |
3/9/2023 |
Passed: Building - Slab |
|
Troy Crews |
3/16/2023 |
Failed: Building - Masonry Wall Reinforcing |
Already Poured Send Third Party Approval |
Troy Crews |
3/29/2023 |
Failed: Building - Vertical Cells/Columns |
|
Troy Crews |
3/29/2023 |
Passed: Building - Slab |
|
Troy Crews |
3/31/2023 |
Failed: Building - Framing |
Not Ready Framing Has Been Moved To Cut Floor. |
Troy Crews |
4/5/2023 |
Failed: Electrical - 2nd Rough-In |
Not Ready Floor Cut New Conduits Going In. |
Troy Crews |
4/5/2023 |
Passed: Mechanical - Rough In |
Main Ducts For Air Handlers. |
Troy Crews |
4/19/2023 |
Passed: Electrical - 2nd Rough-In |
Partial Hallway North End |
Troy Crews |
4/24/2023 |
Passed: Mechanical - Framing/Fire Damper |
|
Troy Crews |
4/24/2023 |
Passed: Mechanical - Rough In |
|
Troy Crews |
4/24/2023 |
Passed: Plumbing/Gas - 2nd Rough-In |
Need To Stub Out Condensate Drain |
Troy Crews |
4/24/2023 |
Passed: Plumbing/Gas - 2nd Rough-In |
50 Psi Test. |
Troy Crews |
4/26/2023 |
Passed: Electrical - 2nd Rough-In |
|
Troy Crews |
4/27/2023 |
Passed: Plumbing/Gas - 2nd Rough-In |
Two Areas Still Need Water Line Test |
Troy Crews |
4/27/2023 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Troy Crews |
5/2/2023 |
Passed: Mechanical - Rough In |
|
Troy Crews |
5/5/2023 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Troy Crews |
5/5/2023 |
Passed: Mechanical - Rough In |
Partial Supply Ducts |
Anthony Aslan |
5/12/2023 |
Rescheduled 5/26/2023:Mechanical - Rough In |
|
Troy Crews |
5/25/2023 |
Passed: Mechanical - Rough In |
Superintendent Signed Off Pressure Test On 5-25-23 |
Anthony Aslan |
5/26/2023 |
Passed: Electrical - Permanent Power |
|
Troy Crews |
6/13/2023 |
Release to power company |
|
Troy Crews |
6/13/2023 |
Passed: Building - Fire Rated Wall |
|
Troy Crews |
6/29/2023 |
Passed: Electrical - Above Ceiling |
|
Troy Crews |
6/29/2023 |
Passed: Building - Final |
Ok To Stock And Prep. Pending Fire Dept. Approval |
Troy Crews |
7/7/2023 |
Passed: Building - Final |
Co Pending Fire Insp. And Panel Schedules |
Troy Crews |
10/2/2023 |
Passed: Fire - Fire Final |
Add Knox Box And Remove Electric Key Pad Lock On Riser Room Door |
Joshua Wehinger |
10/3/2023 |
Certificate-Release Certificate |
Panels Labeled And Fire Final Done |
Troy Crews |
10/4/2023 |