Inspection |
Notes |
Performed By |
Date |
Passed: Plumbing/Gas - 1st Underground Rough–In |
West Half First Rough E.r. Addition |
Troy Crews |
8/11/2022 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
North End Rough In Sanitary And Storm |
Troy Crews |
8/25/2022 |
Failed: Building - Slab |
Already Poured, Need Third Party Inspection Report And Pictures If Available |
Troy Crews |
8/31/2022 |
Cancelled: Plumbing/Gas - Rain Leader |
|
Melissa Garber |
9/7/2022 |
Cancelled: Plumbing/Gas - Rain Leader |
|
Troy Crews |
9/8/2022 |
Passed: Building - Slab |
N Half Emergency Room Addition |
Troy Crews |
9/12/2022 |
Passed: Building - Slab |
Penthouse Slab At Emergency Room Job |
Troy Crews |
9/20/2022 |
Passed: Building - Framing |
South Wall And Partial North Wall. |
Troy Crews |
10/7/2022 |
Passed: Building - Framing |
Remainder Exterior Walls Er Area. |
Troy Crews |
10/12/2022 |
Passed: Building - Framing |
Remainder Exterior Walls Er. |
Troy Crews |
10/18/2022 |
Passed: Building - Wall Sheathing |
|
Troy Crews |
10/18/2022 |
Passed: Building - Framing |
Partial For Top Four Feet Of Walls |
Troy Crews |
10/21/2022 |
Failed: Fire - Fire Rated Wall |
Several Locations Where Coating Had Been Compromised Due To Clamps And Damage. Two I Beams That Were Installed Due To A Damaged I Beam Had No Coating At All. Told The Superintendent To Call For Reinspection Once Everything Was Ready. |
Dwight Boozer |
10/21/2022 |
Passed: Building - Wall Sheathing |
Remainder Exterior Sheathing, Exterior Insulation, And Window Sill Mounting. |
Troy Crews |
10/25/2022 |
Passed: Plumbing/Gas - Water Pipe |
Eastside Of Er Area |
Troy Crews |
10/28/2022 |
Passed: Building - Framing |
Window Frames Installed In Jam |
Troy Crews |
10/28/2022 |
Passed: Building - Rated Assembly Fastening |
|
Troy Crews |
10/28/2022 |
Passed: Plumbing/Gas - Rain Leader |
|
Troy Crews |
10/28/2022 |
Passed: Building - Ext Strapping/Wall Sheathing |
|
Troy Crews |
11/1/2022 |
Passed: Building - Framing |
Partial Interior Middle |
Troy Crews |
11/15/2022 |
Passed: Electrical - 2nd Rough-In |
Partial Interior Middle |
Troy Crews |
11/15/2022 |
Passed: Mechanical - Rough In |
Partial |
Troy Crews |
11/15/2022 |
Passed: Plumbing/Gas - Sanitary |
Interior Middle Pressure On Water And Waste Lines Test. |
Troy Crews |
11/15/2022 |
Passed: Plumbing/Gas - 2nd Rough-In |
Partial |
Troy Crews |
11/15/2022 |
Passed: Mechanical - Framing/Fire Damper |
All Fire Dampers Not Fire Smoke Activated Observed In Closed Position To Confirm No Obstruction. |
Troy Crews |
11/16/2022 |
Passed: Electrical - 2nd Rough-In |
Partial |
Troy Crews |
12/12/2022 |
Passed: Plumbing/Gas - Sanitary |
Reminder Of Sanitary Top Out |
Troy Crews |
12/12/2022 |
Passed: Plumbing/Gas - Water Pipe |
Remainder Of Potable Water Piping Test |
Troy Crews |
12/12/2022 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Troy Crews |
12/12/2022 |
Passed: Plumbing/Gas - Medical Gas |
150 Psi Test All 3 Lines. |
Troy Crews |
12/12/2022 |
Passed: Mechanical - Pipe Pressure Test |
150 Psi Hot Water Lines For Vav |
Troy Crews |
12/15/2022 |
Passed: Building - Framing |
Approved As Requested |
Troy Crews |
12/28/2022 |
Passed: Building - Fire Rated Wall |
Approved As Requested |
Troy Crews |
12/28/2022 |
Passed: Electrical - 2nd Rough-In |
|
Troy Crews |
12/28/2022 |
Passed: Building - Framing |
Front Canopy |
Troy Crews |
1/17/2023 |
Passed: Electrical - Above Ceiling |
Front Canopy |
Troy Crews |
1/17/2023 |
Passed: Plumbing/Gas - Rain Leader |
Front Canopy |
Troy Crews |
1/17/2023 |
Failed: Building - Fire Rated Wall |
Not Complete, Need Fire Caulking And Electrical Complete. |
Troy Crews |
3/22/2023 |
Failed: Electrical - Above Ceiling |
Not Complete. |
Troy Crews |
3/28/2023 |
Passed: Electrical - Above Ceiling |
|
Troy Crews |
3/31/2023 |
Passed: Fire - Fire Final |
|
Dwight Boozer |
4/19/2023 |
Passed: Building - Final |
Area A Phase 1 A, And 1 B |
Troy Crews |
4/19/2023 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
Partial Waste Lines |
Troy Crews |
7/6/2023 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Troy Crews |
7/11/2023 |
Passed: Building - Framing |
|
Troy Crews |
7/14/2023 |
Passed: Building - Framing |
Send Me Pictures Of Pressure Test On Last Two Plumbing Lines. |
Troy Crews |
7/18/2023 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Troy Crews |
8/3/2023 |
Passed: Building - Fire Rated Wall |
Partial |
Troy Crews |
8/18/2023 |
Passed: Electrical - Above Ceiling |
|
Troy Crews |
8/22/2023 |
Passed: Fire - Fire Rated Wall |
Labels Have Been Installed |
Troy Crews |
8/22/2023 |
Rescheduled 8/28/2023:Building - Final |
|
Troy Crews |
8/28/2023 |
Passed: Building - Final |
|
Troy Crews |
8/28/2023 |
Passed: Building - Framing |
Partial West End Pharmacy |
Troy Crews |
9/7/2023 |
Passed: Building - Insulation |
West End |
Troy Crews |
9/7/2023 |
Passed: Electrical - 2nd Rough-In |
Partial |
Troy Crews |
9/15/2023 |
Passed: Plumbing/Gas - 2nd Rough-In |
2 Sink Areas In Wall Only |
Troy Crews |
9/15/2023 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
Tie In Two Sinks To Existing Sanitary |
Troy Crews |
9/25/2023 |
Passed: Building - Ext Strapping/Wall Sheathing |
|
Troy Crews |
10/3/2023 |
Passed: Electrical - 2nd Rough-In |
|
Troy Crews |
10/3/2023 |
Passed: Plumbing/Gas - Water Pipe |
|
Troy Crews |
10/11/2023 |
Passed: Electrical - Above Ceiling |
|
Troy Crews |
10/25/2023 |
Passed: Plumbing/Gas - Water Pipe |
|
Troy Crews |
10/25/2023 |
Passed: Electrical - Above Ceiling |
|
Troy Crews |
11/9/2023 |
Passed: Fire - Fire Rated Wall |
|
Troy Crews |
11/9/2023 |
Passed: Plumbing/Gas - Water Pipe |
|
Troy Crews |
11/9/2023 |
Passed: Building - Final |
Pharmacy Phase |
Troy Crews |
12/4/2023 |
Cancelled: Plumbing/Gas - Rain Leader |
|
Troy Crews |
2/1/2024 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
Grease Floor Drains |
Troy Crews |
2/1/2024 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
Vent Lines |
Troy Crews |
2/5/2024 |
Passed: Building - Framing |
|
Troy Crews |
2/14/2024 |
Passed: Mechanical - Rough In |
Partial |
Troy Crews |
2/14/2024 |
Passed: Plumbing/Gas - 2nd Rough-In |
2 Nd Rough Walls West Side Of Area |
Troy Crews |
2/14/2024 |
Passed: Building - Framing |
|
Troy Crews |
2/16/2024 |
Passed: Electrical - 2nd Rough-In |
|
Troy Crews |
2/16/2024 |
Passed: Building - Insulation |
|
Troy Crews |
2/16/2024 |
Passed: Building - Strapping |
|
Troy Crews |
2/16/2024 |
Passed: Plumbing/Gas - Sanitary |
|
Troy Crews |
2/16/2024 |
Passed: Plumbing/Gas - Water Pipe |
|
Troy Crews |
2/16/2024 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Troy Crews |
2/16/2024 |
Passed: Mechanical - Rough In |
|
Troy Crews |
2/21/2024 |
Passed: Plumbing/Gas - Sanitary |
|
Troy Crews |
2/21/2024 |
Passed: Plumbing/Gas - Water Pipe |
|
Troy Crews |
2/21/2024 |
Passed: Fire - Fire Rated Wall |
|
Joshua Wehinger |
2/26/2024 |
Rescheduled 2/27/2024:Fire - Sprinkler System Alteration |
|
Troy Crews |
2/27/2024 |
Passed: Fire - Fire Rated Wall |
|
Joshua Wehinger |
2/28/2024 |
Rescheduled 2/28/2024:Fire - Sprinkler System Alteration |
|
Troy Crews |
2/28/2024 |
Passed: Fire - Sprinkler System Alteration |
|
Joshua Wehinger |
2/29/2024 |
Passed: Electrical - Above Ceiling |
|
Troy Crews |
2/29/2024 |
Passed: Mechanical - Rough In |
|
Troy Crews |
2/29/2024 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Troy Crews |
3/7/2024 |
Rescheduled 3/14/2024:Plumbing/Gas - 1st Underground Rough–In |
|
Troy Crews |
3/13/2024 |
Rescheduled 3/14/2024:Plumbing/Gas - Interceptor |
|
Troy Crews |
3/13/2024 |
Rescheduled 3/15/2024:Plumbing/Gas - 1st Underground Rough–In |
|
Troy Crews |
3/14/2024 |
Rescheduled 3/15/2024:Plumbing/Gas - Interceptor |
|
Troy Crews |
3/14/2024 |
Passed: Building - Fire Rated Wall |
|
Troy Crews |
3/14/2024 |
Passed: Electrical - Above Ceiling |
|
Troy Crews |
3/14/2024 |
Passed: Mechanical - Rough In |
|
Troy Crews |
3/14/2024 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Troy Crews |
3/14/2024 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Troy Crews |
3/15/2024 |
Passed: Plumbing/Gas - Interceptor |
|
Troy Crews |
3/15/2024 |
Passed: Plumbing/Gas - Interceptor |
Mai Grease Trap Outside Anchored Down |
Troy Crews |
3/18/2024 |
Passed: Fire - Fire Final |
|
Joshua Wehinger |
3/26/2024 |
Passed: Building - Final |
Dishwash Area And Dining Area |
Troy Crews |
3/26/2024 |
Passed: Fire - Fire Final |
|
Joshua Wehinger |
3/29/2024 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
Outlet |
Troy Crews |
4/19/2024 |
Passed: Building - Framing |
|
Troy Crews |
5/9/2024 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
Partial On Main Grease Trap Line Kitchen Area |
Troy Crews |
5/21/2024 |
Passed: Plumbing/Gas - Sanitary |
|
Troy Crews |
5/21/2024 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
Partial Kit Hen Area |
Troy Crews |
5/29/2024 |
Passed: Building - Framing |
Area To South |
Troy Crews |
6/5/2024 |
Passed: Electrical - 1st Underground Rough–In |
|
Troy Crews |
6/5/2024 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
Partial South Area |
Troy Crews |
6/5/2024 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
Remainder Kitchen Area |
Troy Crews |
6/12/2024 |
Passed: Plumbing/Gas - Sanitary |
|
Troy Crews |
6/12/2024 |
Passed: Building - Framing |
New Kitchen Area Walls |
Troy Crews |
6/26/2024 |
Passed: Building - Fire Rated Wall |
Shaft Wall Installed Cooler Area |
Troy Crews |
6/26/2024 |
Passed: Electrical - 2nd Rough-In |
|
Troy Crews |
6/26/2024 |
Passed: Mechanical - Kitchen Hood |
Partial Hoods All Thread Hangars |
Troy Crews |
6/26/2024 |
Passed: Plumbing/Gas - Water Pipe |
|
Troy Crews |
6/26/2024 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Troy Crews |
6/26/2024 |
Passed: Fire - Kitchen Hood – Fire Suppression Test |
|
Joshua Wehinger |
6/26/2024 |
Passed: Plumbing/Gas - Sanitary |
Grease Line Around Storm Manhole To New Grease Interceptor. |
Troy Crews |
6/28/2024 |
Passed: Electrical - Above Ceiling |
Pictures Sent |
Troy Crews |
7/10/2024 |
Passed: Plumbing/Gas - Water Pipe |
Pictures Sent |
Troy Crews |
7/10/2024 |
Passed: Plumbing/Gas - Water Pipe |
Pictures Sent |
Troy Crews |
7/15/2024 |
Passed: Fire - Fire Rated Wall |
|
Joshua Wehinger |
8/1/2024 |
Passed: Building - Fire Rated Wall |
|
Joshua Wehinger |
8/1/2024 |
Passed: Mechanical - Pipe Pressure Test |
Kitchen Piping Rough In 100psi |
Troy Crews |
8/15/2024 |
Passed: Electrical - Above Ceiling |
|
Troy Crews |
9/4/2024 |
Passed: Building - Final |
Phase 6 Partial Kitchen Area |
Troy Crews |
9/11/2024 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
7th Phase Kitchen Area |
Troy Crews |
11/21/2024 |
Passed: Building - Framing |
Kitchen Area Phase 7 |
Troy Crews |
12/5/2024 |
Passed: Electrical - 2nd Rough-In |
Phase 7 |
Troy Crews |
12/5/2024 |
Passed: Plumbing/Gas - 2nd Rough-In |
Phase 7 |
Troy Crews |
12/5/2024 |
Passed: Mechanical - Pipe Pressure Test |
|
Troy Crews |
12/11/2024 |
Passed: Plumbing/Gas - Sanitary |
|
Troy Crews |
12/11/2024 |
Passed: Plumbing/Gas - Water Pipe |
|
Troy Crews |
12/11/2024 |
Passed: Electrical - Above Ceiling |
Partial For Border Tiles |
Troy Crews |
1/13/2025 |
Passed: Electrical - Above Ceiling |
|
Troy Crews |
1/17/2025 |
Certificate-Release Certificate |
All Phases Now Complete |
Troy Crews |
2/4/2025 |
Passed: Building - Final |
|
Troy Crews |
2/4/2025 |
(Requested) Fire-Aboveground Sprinkler - Visual (On Site) |
|
|
|
(Requested) Mechanical-Kitchen Hood |
|
|
|
(Requested) Plumbing/Gas-Sanitary |
|
|
|
(Requested) Plumbing/Gas-Water Pipe |
|
|
|
(Requested) Plumbing/Gas-2nd Rough-In |
|
|
|
(Requested) Fire-Sprinkler System Alteration |
|
|
|
(Requested) Mechanical-Pipe Pressure Test |
|
|
|
(Requested) Fire-Sprinkler System Alteration |
|
|
|