Permit Details

Permit Search

Permit

Roof Replacement or Repair

330 SW LAPAZ TER
LAKE CITY, FL 32024

Permit #
000044163
Application #
54332
Status Completed
  1. Submitted Apr 11, 2022
  2. Issued Apr 12, 2022
  3. Expires Dec 10, 2022
  4. Completed Jun 13, 2022

Property

Parcel #
03185-024
Owner
Parker Earnetta Lafonda
Acres
1.04
Subdivision
Green Acres
Zoning
RSF-2
Flood zone
X
District
5

Permit

Status
Completed
Septic release
N/A
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0381D
Type Roofing Job
Overlay with Metal
Type of structure
House
Commercial or Residential
Residential
Roof Area (for this job) Sq Ft
0.00
No. of Stories
1
Roof Pitch
2:12 to 4:12
Is the existing roof being removed?
No
Explain if not removing the existing roofing material?
overlay with metal
Type of New Roofing Product
Metal
Florida Product Approval Number
FL17992_R2_II_29 GA
Product Manufacturer
Capital Metal
Product Description
29 gauge capital rib roof panel
Building Code Edition
2020 Florida Building Code 7th Edition and Florida Statute 553.844
Sealed roof decking options: (Must select an option.)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Ventilation:
Ridge Vent
Flashing:
Use Existing
Drip Edge:
Replace All
Valley Treatment:
New Metal

Status & Review History

  1. Application pending.
  2. Permit Issued

Contractors

  • Tyler M Turner

    Tmt Roofing Llc

    License
    CCC1330410
    Title
    Cert Roofing
    Role
    Contractor

Inspections

  1. May 24, 2022

    Rescheduled 5/25/2022:Re-Roof - In Progress

    Inspected by Anthony Aslan

  2. May 25, 2022

    Passed: Re-Roof - In Progress

    Inspected by Troy Crews

  3. Jun 2, 2022

    Failed: Re-Roof - Final

    Owner Has Contract Questions Regarding Low Slope Roof In Rear.

    Inspected by Troy Crews

  4. Jun 13, 2022

    Passed: Re-Roof - Final

    No Known Code Issues. Per Contractor They Will Handle Issue With Customer.

    Inspected by Troy Crews