3/15/2022
|
Application pending.
|
3/15/2022
|
City of Lake City Utilities Notified
City of Lake City Notified of Application within Utility Service Areas LC_WATER,.
|
3/15/2022
|
Point Review - Processing
|
3/15/2022
|
Point Review - Reviewed
NEEDED:
*ENV HEALTH
*LANDOWNER AFFIDAVIT
|
3/16/2022
|
Plan Review - Reviewed
NEEDED:
*ENV HEALTH
*LANDOWNER AFFIDAVIT
|
3/17/2022
|
Zoning Review - Reviewed
NEEDED:
*ENV HEALTH
*LANDOWNER AFFIDAVIT
*IF MINIMUM FLOOR ELEVATION CANNOT BE MET THEN AN ENGINEER LETTER WILL BE REQUIRED
|
3/21/2022
|
Zoning Review - Reviewed
NEEDED:
*ENV HEALTH
*LANDOWNER AFFIDAVIT
*IF MINIMUM FLOOR ELEVATION CANNOT BE MET THEN AN ENGINEER LETTER WILL BE REQUIRED
|
3/21/2022
|
Final Review - Documents Required
NEEDED:
*ENV HEALTH
*LANDOWNER AFFIDAVIT
*IF MINIMUM FLOOR ELEVATION CANNOT BE MET THEN AN ENGINEER LETTER WILL BE REQUIRED
|
3/22/2022
|
Final Review - Documents Required
NEEDED:
*LANDOWNER AFFIDAVIT
*IF MINIMUM FLOOR ELEVATION CANNOT BE MET THEN AN ENGINEER LETTER WILL BE REQUIRED
|
3/25/2022
|
Final Review - Documents Required
NEEDED:
*LANDOWNER AFFIDAVIT
*IF MINIMUM FLOOR ELEVATION CANNOT BE MET THEN AN ENGINEER LETTER WILL BE REQUIRED
|
3/31/2022
|
Final Review - Documents Required
NEEDED:
*DC FOR MR. PATE
*IF MINIMUM FLOOR ELEVATION CANNOT BE MET THEN AN ENGINEER LETTER WILL BE REQUIRED
|
4/8/2022
|
Final Review - Reviewed
*IF MINIMUM FLOOR ELEVATION CANNOT BE MET THEN AN ENGINEER LETTER WILL BE REQUIRED
|
4/8/2022
|
Final Review - Payment Needed
*IF MINIMUM FLOOR ELEVATION CANNOT BE MET THEN AN ENGINEER LETTER WILL BE REQUIRED
|
4/8/2022
|
Permit Issued
Permit #000044140 created and approved.
|