Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Commercial Construction Permit

Address 3004 W US HIGHWAY 90
LAKE CITY, FL 32055
Parcel #: 02581-001
Acres: 2.66
Owner: Oasis Lake City Llc
Subdivision: Lake Harris Farms Unit A
Zoning:
Flood Zone: X
District: 5
Application #: 53598
Permit #: 000044117
Related Permit:
Submitted: Monday, February 21, 2022
Issued: Friday, April 15, 2022
Expires: Thursday, November 7, 2024
Completed: Thursday, November 7, 2024
Status: Completed
Septic Release? Yes
Notes:
LAKE CITY UTLITY CUSTOMER SERVICE NOTES THE CUSTOMER HAS COMPLETED THE TAP APPLICATION. TAP AND IMPACT FEES HAVE BEEN PAID LAKE CITY ZONING NOTES LANDSCAPE REQUIREMENTS MINIMUM LANDSCAPED BUFFERING REQUIREMENTS 1. ALL PERMITTED USES (UNLESS OTHERWISE SPECIFIED): WHERE A USE LISTED UNDER (1) ABOVE IS ERECTED OR EXPANDED ON LAND ABUTTING A RESIDENTIAL DISTRICT, THEN THE PROPOSED USE SHALL PROVIDE A LANDSCAPED BUFFER WHICH SHALL BE NOT LESS THAN TEN (10) FEET IN WIDTH ALONG THE AFFECTED REAR AND/OR SIDE YARDS AS THE CASE MAY BE. LAKE CITY CODE ENFORCEMENT CASE NOTES NONE
Job Details
Finished floor requirement
Fema map number 12023C0291D
This is the construction of a: Hotel
Driveway access to property: D.O.T. Permit
Is there a Fire Sprinkler System? Yes
Setbacks Front 20'
Setback Side 1 10'
Setback Side 2 10'
Setback Rear 15'
Describe commercial use: Hotel
Stories 6
Heated Area (Sqft) 72246
Total Area (Sqft) 72246
Building Height 65
Building Code Construction Type I
Building Code Element B
Building Code Occupancy Types Business
Occupancy Use Title Business
Dev Permit # F023-
Design Occupant Load 284
Building Code Edition 2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000) x-city
Sealed roof decking options. (Must select one.) Other (explain)
Service Amps 1200
Review Notes
2/21/2022 Application pending.
2/21/2022 City of Lake City
2/21/2022 City of Lake City
2/23/2022 Point Review - Printed-Online Application
2/23/2022 Point Review - Reviewed
2/24/2022 Plan Review - Documents Required
2/28/2022 Plan Review - Documents Required
3/3/2022 Plan Review - Documents Required
3/15/2022 Plan Review - Plumbing Approved
3/15/2022 Plan Review - Mechanical Approved
3/15/2022 Plan Review - Electrical Approved
3/15/2022 Plan Review - Building Approved
3/15/2022 Plan Review - Reviewed
3/15/2022 Zoning Review - Documents Required
3/17/2022 Zoning Review - Documents Required
3/18/2022 Zoning Review - Documents Required
3/22/2022 Zoning Review - Documents Required
3/25/2022 Zoning Review - Documents Required
3/29/2022 Zoning Review - Documents Required
4/4/2022 City of Lake City
4/5/2022 Zoning Review - Reviewed
4/5/2022 Final Review - Reviewed
4/6/2022 Permit Issued
4/15/2022 Permit Reissued
Contractors
Name/ Business License Title Role
Benjamin T Keeler
Keeler Roofing, Llc
CCC1330509 Cert. Roofing Subcontractor
Erik W Worthmann
Comfort Temp Company/dba Ct Mechanical
CMC1249305 Cert. Mechanical Subcontractor
Lyndon J Rainbolt
Rainbolt Tech Services,air Stream
County License & State License Expired.
EC13001835 Electrical Contractor Subcontractor
Laster Faulkner
Vertical Plumbing Llc
County License & State License & Liability Insurance & Workers Comp & Employees Workers Comp Expired.
CFC1426421 Plumbing Contractor Subcontractor
Santos Santiago
Caribbean Fire & Associates, Inc.
County License & State License & Liability Insurance & Workers Comp Expired.
696987-0001-1996 Fire System Subcontractor
Matthew T Gray
Gray Construction Services Inc
County License & State License Expired.
CGC062854 Cert General Contractor
Inspections
Inspection Notes Performed By Date
Passed: Electrical - Temporary Service Troy Crews 4/6/2022
Release to power company Troy Crews 4/6/2022
Cancelled: Building - Footer Melissa Garber 4/19/2022
Cancelled: Engineering - Setbacks Melissa Garber 4/19/2022
Passed: Building - Footer Interior Footers Troy Crews 4/20/2022
Passed: Engineering - Setbacks Troy Crews 4/20/2022
Cancelled: Building - Footer Emaleigh Williams 4/20/2022
Cancelled: Engineering - Setbacks Emaleigh Williams 4/20/2022
Passed: Building - Footer West End Perimeter And Column Pads. Troy Crews 4/21/2022
Passed: Engineering - Setbacks Troy Crews 4/21/2022
Passed: Building - Footer Southwest Corner And Side Troy Crews 4/25/2022
Passed: Engineering - Setbacks Troy Crews 4/25/2022
Rescheduled 4/28/2022:Building - Footer Troy Crews 4/27/2022
Rescheduled 4/28/2022:Engineering - Setbacks Troy Crews 4/27/2022
Passed: Engineering - Setbacks Troy Crews 4/28/2022
Passed: Building - Footer Partial North Side, Partial South Side Troy Crews 4/28/2022
Passed: Building - Footer Partial Foundations Troy Crews 5/4/2022
Passed: Engineering - Setbacks Troy Crews 5/4/2022
Passed: Building - Footer Partial East End Middle Troy Crews 5/9/2022
Passed: Engineering - Setbacks Troy Crews 5/9/2022
Passed: Building - Footer Partial East End Troy Crews 5/13/2022
Passed: Engineering - Setbacks Troy Crews 5/13/2022
Passed: Building - Masonry Wall Reinforcing Partial Walls And Steel Columns Troy Crews 5/16/2022
Passed: Building - Masonry Wall Reinforcing Remainder First Lift Troy Crews 5/17/2022
Passed: Building - Masonry Wall Reinforcing Top Out First Floor East End Troy Crews 5/23/2022
Passed: Building - Footer Elevator Pit Troy Crews 6/6/2022
Passed: Engineering - Setbacks Troy Crews 6/6/2022
Passed: Building - Masonry Wall Reinforcing Elevator Pit Walls Up To Slab Level Troy Crews 6/9/2022
Passed: Building - Footer Spread Footings Outside Elevator Shaft Troy Crews 6/14/2022
Passed: Engineering - Setbacks Troy Crews 6/14/2022
Passed: Building - Masonry Wall Reinforcing 2nd Lift Elevator Walls And Columns Troy Crews 6/22/2022
Passed: Building - Rated Assembly Fastening Partial Slabs Second Floor East Side. Troy Crews 7/6/2022
Passed: Building - Rated Assembly Fastening Second Floor Perimeter Pour. Troy Crews 7/11/2022
Cancelled: Plumbing/Gas - 1st Underground Rough–In Duplicate Emaleigh Williams 7/12/2022
Passed: Plumbing/Gas - 1st Underground Rough–In Main Trunk Lines First Floor. Troy Crews 7/13/2022
Passed: Plumbing/Gas - 2nd Rough-In Reminder Of First Floor Waste Lines. Troy Crews 7/20/2022
Passed: Building - Rated Assembly Fastening Steel Beam Connections 2 Nd Floor Troy Crews 8/2/2022
Passed: Building - Rated Assembly Fastening Troy Crews 8/5/2022
Passed: Building - Rated Assembly Fastening 3rd Floor Precast Grouting. Troy Crews 8/9/2022
Passed: Building - Slab Partial First Floor Troy Crews 8/12/2022
Passed: Building - Slab Remainder Of First Floor Slab Except Kitchen Area Troy Crews 8/17/2022
Passed: Building - Masonry Wall Reinforcing Third Floor Walls And Columns Troy Crews 8/22/2022
Passed: Building - Rated Assembly Fastening Troy Crews 8/30/2022
Passed: Building - Rated Assembly Fastening Fourth Floor Seams Troy Crews 9/9/2022
Cancelled: Building - Rated Assembly Fastening Troy Crews 9/12/2022
Passed: Building - Rated Assembly Fastening 4th Floor Steel Column Extensions Troy Crews 9/13/2022
Passed: Building - Masonry Wall Reinforcing 4th Floor Walls Troy Crews 9/20/2022
Passed: Fire - Fire Rated Wall Fireproofing Inspected By F.d. Some Touch Up Needed On First Floor Troy Crews 9/22/2022
Passed: Building - Rated Assembly Fastening Troy Crews 10/3/2022
Passed: Building - Slab Troy Crews 10/10/2022
Passed: Building - Vertical Cells/Columns Troy Crews 10/17/2022
Rescheduled 10/24/2022:Building - Rated Assembly Fastening Troy Crews 10/21/2022
Passed: Building - Rated Assembly Fastening Troy Crews 10/24/2022
Passed: Building - Slab Troy Crews 10/31/2022
Passed: Building - Masonry Wall Reinforcing Troy Crews 11/14/2022
Passed: Building - Rated Assembly Fastening 6 Th Floor Steel And Embeds. Troy Crews 11/22/2022
Passed: Building - Rated Assembly Fastening Roof Deck Pour Troy Crews 12/1/2022
Passed: Building - Framing Exterior Framing Only Troy Crews 12/2/2022
Passed: Building - Masonry Wall Reinforcing Troy Crews 12/5/2022
Passed: Fire - Fire Rated Wall Dwight Boozer 12/19/2022
Rescheduled 12/21/2022:Building - Rated Assembly Fastening Troy Crews 12/20/2022
Passed: Building - Rated Assembly Fastening Stairs Se Corner Troy Crews 12/21/2022
Passed: Building - Masonry Wall Reinforcing Troy Crews 12/21/2022
Passed: Building - Framing Troy Crews 1/3/2023
Passed: Building - Rated Assembly Fastening Troy Crews 1/3/2023
Passed: Mechanical - Rough In Troy Crews 1/4/2023
Passed: Building - Ext Strapping/Wall Sheathing Troy Crews 1/17/2023
Passed: Mechanical - Rough In Main Trunk Lines For Insulation , Floors 2 ,3,5 Troy Crews 1/19/2023
Passed: Building - Roof Decking Troy Crews 1/26/2023
Passed: Plumbing/Gas - 1st Underground Rough–In Sanitary And Grease Trap Troy Crews 1/31/2023
Passed: Building - Monolithic Slab Troy Crews 2/6/2023
Passed: Engineering - Setbacks Troy Crews 2/6/2023
Passed: Building - Framing Troy Crews 3/1/2023
Passed: Electrical - 2nd Rough-In Troy Crews 3/1/2023
Passed: Plumbing/Gas - 2nd Rough-In All Guest Rooms Break Room First Floor Troy Crews 3/1/2023
Passed: Mechanical - Above Ceiling 2nd & 3rd Floor Make Up Air Rough Anthony Aslan 3/1/2023
Failed: Fire - Aboveground Sprinkler - Visual (On Site) Conducted Sprinkler Inspection For Second And Third Floors. The Sprinkler For The Ice Machine Room Needs To Be Centered In The Room. It Is Currently In The Hvac Riser Area. Dwight Boozer 3/2/2023
Passed: Mechanical - Rough In 4 & 6 Hallway Ducts Anthony Aslan 3/8/2023
Passed: Building - Framing 4 Th Floor Troy Crews 3/27/2023
Passed: Electrical - 2nd Rough-In 4 Th Floor Troy Crews 3/27/2023
Passed: Mechanical - Rough In 4th Floor. Troy Crews 3/27/2023
Passed: Building - Framing Troy Crews 4/12/2023
Passed: Electrical - 2nd Rough-In Troy Crews 4/12/2023
Passed: Mechanical - Rough In Troy Crews 4/12/2023
Passed: Building - Framing Troy Crews 4/19/2023
Passed: Electrical - 2nd Rough-In Troy Crews 4/19/2023
Passed: Mechanical - Rough In Troy Crews 4/19/2023
Passed: Mechanical - Rough In First Floor Main Trunk Lines To Insulate. Troy Crews 5/5/2023
Passed: Building - Framing Troy Crews 5/22/2023
Passed: Electrical - 2nd Rough-In Troy Crews 5/22/2023
Passed: Building - Framing Touch Up Fire Proofing Main Beams Several Spots. Troy Crews 6/8/2023
Passed: Electrical - 2nd Rough-In Troy Crews 6/8/2023
Passed: Mechanical - Rough In Troy Crews 6/8/2023
Passed: Plumbing/Gas - 2nd Rough-In Troy Crews 6/8/2023
Passed: Fire - Fire Rated Wall Dwight Boozer 8/21/2023
Passed: Electrical - Permanent Power Troy Crews 9/21/2023
Release to power company Troy Crews 9/21/2023
Passed: Electrical - Permanent Power Troy Crews 9/27/2023
Passed: Fire - Aboveground Hydro - Sprinkler Joshua Wehinger 2/1/2024
Passed: Electrical - Above Ceiling 5 Th And 6 Floors Remove Temp Lighting Troy Crews 2/28/2024
Passed: Electrical - Above Ceiling 2 Nd 3 Rd 4th Floors Troy Crews 3/7/2024
Passed: Electrical - Above Ceiling Call Back For Front Meeting Room Troy Crews 4/24/2024
Passed: Electrical - Above Ceiling Troy Crews 4/26/2024
Cancelled: Fire - Kitchen Hood – Fire Suppression Test Troy Crews 7/11/2024
Passed: Building - Final Partial ,need Fire Final And Access To First Floor Rooms When Co Final Is Done With Fire Marshall. Troy Crews 8/12/2024
Passed: Fire - Kitchen Hood – Fire Suppression Test Joshua Wehinger 8/26/2024
Passed: Building - Final Partial Finished Guest Rooms First Floor, Need Fire Final, Elevator Final, Inspect Rooftop. Troy Crews 9/12/2024
Cancelled: Fire - Fire Final Troy Crews 9/12/2024
Certificate-Release Certificate Troy Crews 11/7/2024
Passed: Fire - Fire Final Ok Per Ret Tompkins 11-7-24 Troy Crews 11/7/2024
Passed: Building - Final Cannot Closed Permit Or Release Certificate Of Occupancy Due To Missing Required Documents. Troy Crews 11/7/2024