Inspection |
Notes |
Performed By |
Date |
Passed: Electrical - Temporary Service |
|
Troy Crews |
4/6/2022 |
Release to power company |
|
Troy Crews |
4/6/2022 |
Cancelled: Building - Footer |
|
Melissa Garber |
4/19/2022 |
Cancelled: Engineering - Setbacks |
|
Melissa Garber |
4/19/2022 |
Passed: Building - Footer |
Interior Footers |
Troy Crews |
4/20/2022 |
Passed: Engineering - Setbacks |
|
Troy Crews |
4/20/2022 |
Cancelled: Building - Footer |
|
Emaleigh Williams |
4/20/2022 |
Cancelled: Engineering - Setbacks |
|
Emaleigh Williams |
4/20/2022 |
Passed: Building - Footer |
West End Perimeter And Column Pads. |
Troy Crews |
4/21/2022 |
Passed: Engineering - Setbacks |
|
Troy Crews |
4/21/2022 |
Passed: Building - Footer |
Southwest Corner And Side |
Troy Crews |
4/25/2022 |
Passed: Engineering - Setbacks |
|
Troy Crews |
4/25/2022 |
Rescheduled 4/28/2022:Building - Footer |
|
Troy Crews |
4/27/2022 |
Rescheduled 4/28/2022:Engineering - Setbacks |
|
Troy Crews |
4/27/2022 |
Passed: Engineering - Setbacks |
|
Troy Crews |
4/28/2022 |
Passed: Building - Footer |
Partial North Side, Partial South Side |
Troy Crews |
4/28/2022 |
Passed: Building - Footer |
Partial Foundations |
Troy Crews |
5/4/2022 |
Passed: Engineering - Setbacks |
|
Troy Crews |
5/4/2022 |
Passed: Building - Footer |
Partial East End Middle |
Troy Crews |
5/9/2022 |
Passed: Engineering - Setbacks |
|
Troy Crews |
5/9/2022 |
Passed: Building - Footer |
Partial East End |
Troy Crews |
5/13/2022 |
Passed: Engineering - Setbacks |
|
Troy Crews |
5/13/2022 |
Passed: Building - Masonry Wall Reinforcing |
Partial Walls And Steel Columns |
Troy Crews |
5/16/2022 |
Passed: Building - Masonry Wall Reinforcing |
Remainder First Lift |
Troy Crews |
5/17/2022 |
Passed: Building - Masonry Wall Reinforcing |
Top Out First Floor East End |
Troy Crews |
5/23/2022 |
Passed: Building - Footer |
Elevator Pit |
Troy Crews |
6/6/2022 |
Passed: Engineering - Setbacks |
|
Troy Crews |
6/6/2022 |
Passed: Building - Masonry Wall Reinforcing |
Elevator Pit Walls Up To Slab Level |
Troy Crews |
6/9/2022 |
Passed: Building - Footer |
Spread Footings Outside Elevator Shaft |
Troy Crews |
6/14/2022 |
Passed: Engineering - Setbacks |
|
Troy Crews |
6/14/2022 |
Passed: Building - Masonry Wall Reinforcing |
2nd Lift Elevator Walls And Columns |
Troy Crews |
6/22/2022 |
Passed: Building - Rated Assembly Fastening |
Partial Slabs Second Floor East Side. |
Troy Crews |
7/6/2022 |
Passed: Building - Rated Assembly Fastening |
Second Floor Perimeter Pour. |
Troy Crews |
7/11/2022 |
Cancelled: Plumbing/Gas - 1st Underground Rough–In |
Duplicate |
Emaleigh Williams |
7/12/2022 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
Main Trunk Lines First Floor. |
Troy Crews |
7/13/2022 |
Passed: Plumbing/Gas - 2nd Rough-In |
Reminder Of First Floor Waste Lines. |
Troy Crews |
7/20/2022 |
Passed: Building - Rated Assembly Fastening |
Steel Beam Connections 2 Nd Floor |
Troy Crews |
8/2/2022 |
Passed: Building - Rated Assembly Fastening |
|
Troy Crews |
8/5/2022 |
Passed: Building - Rated Assembly Fastening |
3rd Floor Precast Grouting. |
Troy Crews |
8/9/2022 |
Passed: Building - Slab |
Partial First Floor |
Troy Crews |
8/12/2022 |
Passed: Building - Slab |
Remainder Of First Floor Slab Except Kitchen Area |
Troy Crews |
8/17/2022 |
Passed: Building - Masonry Wall Reinforcing |
Third Floor Walls And Columns |
Troy Crews |
8/22/2022 |
Passed: Building - Rated Assembly Fastening |
|
Troy Crews |
8/30/2022 |
Passed: Building - Rated Assembly Fastening |
Fourth Floor Seams |
Troy Crews |
9/9/2022 |
Cancelled: Building - Rated Assembly Fastening |
|
Troy Crews |
9/12/2022 |
Passed: Building - Rated Assembly Fastening |
4th Floor Steel Column Extensions |
Troy Crews |
9/13/2022 |
Passed: Building - Masonry Wall Reinforcing |
4th Floor Walls |
Troy Crews |
9/20/2022 |
Passed: Fire - Fire Rated Wall |
Fireproofing Inspected By F.d. Some Touch Up Needed On First Floor |
Troy Crews |
9/22/2022 |
Passed: Building - Rated Assembly Fastening |
|
Troy Crews |
10/3/2022 |
Passed: Building - Slab |
|
Troy Crews |
10/10/2022 |
Passed: Building - Vertical Cells/Columns |
|
Troy Crews |
10/17/2022 |
Rescheduled 10/24/2022:Building - Rated Assembly Fastening |
|
Troy Crews |
10/21/2022 |
Passed: Building - Rated Assembly Fastening |
|
Troy Crews |
10/24/2022 |
Passed: Building - Slab |
|
Troy Crews |
10/31/2022 |
Passed: Building - Masonry Wall Reinforcing |
|
Troy Crews |
11/14/2022 |
Passed: Building - Rated Assembly Fastening |
6 Th Floor Steel And Embeds. |
Troy Crews |
11/22/2022 |
Passed: Building - Rated Assembly Fastening |
Roof Deck Pour |
Troy Crews |
12/1/2022 |
Passed: Building - Framing |
Exterior Framing Only |
Troy Crews |
12/2/2022 |
Passed: Building - Masonry Wall Reinforcing |
|
Troy Crews |
12/5/2022 |
Passed: Fire - Fire Rated Wall |
|
Dwight Boozer |
12/19/2022 |
Rescheduled 12/21/2022:Building - Rated Assembly Fastening |
|
Troy Crews |
12/20/2022 |
Passed: Building - Rated Assembly Fastening |
Stairs Se Corner |
Troy Crews |
12/21/2022 |
Passed: Building - Masonry Wall Reinforcing |
|
Troy Crews |
12/21/2022 |
Passed: Building - Framing |
|
Troy Crews |
1/3/2023 |
Passed: Building - Rated Assembly Fastening |
|
Troy Crews |
1/3/2023 |
Passed: Mechanical - Rough In |
|
Troy Crews |
1/4/2023 |
Passed: Building - Ext Strapping/Wall Sheathing |
|
Troy Crews |
1/17/2023 |
Passed: Mechanical - Rough In |
Main Trunk Lines For Insulation , Floors 2 ,3,5 |
Troy Crews |
1/19/2023 |
Passed: Building - Roof Decking |
|
Troy Crews |
1/26/2023 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
Sanitary And Grease Trap |
Troy Crews |
1/31/2023 |
Passed: Building - Monolithic Slab |
|
Troy Crews |
2/6/2023 |
Passed: Engineering - Setbacks |
|
Troy Crews |
2/6/2023 |
Passed: Building - Framing |
|
Troy Crews |
3/1/2023 |
Passed: Electrical - 2nd Rough-In |
|
Troy Crews |
3/1/2023 |
Passed: Plumbing/Gas - 2nd Rough-In |
All Guest Rooms Break Room First Floor |
Troy Crews |
3/1/2023 |
Passed: Mechanical - Above Ceiling |
2nd & 3rd Floor Make Up Air Rough |
Anthony Aslan |
3/1/2023 |
Failed: Fire - Aboveground Sprinkler - Visual (On Site) |
Conducted Sprinkler Inspection For Second And Third Floors. The Sprinkler For The Ice Machine Room Needs To Be Centered In The Room. It Is Currently In The Hvac Riser Area. |
Dwight Boozer |
3/2/2023 |
Passed: Mechanical - Rough In |
4 & 6 Hallway Ducts |
Anthony Aslan |
3/8/2023 |
Passed: Building - Framing |
4 Th Floor |
Troy Crews |
3/27/2023 |
Passed: Electrical - 2nd Rough-In |
4 Th Floor |
Troy Crews |
3/27/2023 |
Passed: Mechanical - Rough In |
4th Floor. |
Troy Crews |
3/27/2023 |
Passed: Building - Framing |
|
Troy Crews |
4/12/2023 |
Passed: Electrical - 2nd Rough-In |
|
Troy Crews |
4/12/2023 |
Passed: Mechanical - Rough In |
|
Troy Crews |
4/12/2023 |
Passed: Building - Framing |
|
Troy Crews |
4/19/2023 |
Passed: Electrical - 2nd Rough-In |
|
Troy Crews |
4/19/2023 |
Passed: Mechanical - Rough In |
|
Troy Crews |
4/19/2023 |
Passed: Mechanical - Rough In |
First Floor Main Trunk Lines To Insulate. |
Troy Crews |
5/5/2023 |
Passed: Building - Framing |
|
Troy Crews |
5/22/2023 |
Passed: Electrical - 2nd Rough-In |
|
Troy Crews |
5/22/2023 |
Passed: Building - Framing |
Touch Up Fire Proofing Main Beams Several Spots. |
Troy Crews |
6/8/2023 |
Passed: Electrical - 2nd Rough-In |
|
Troy Crews |
6/8/2023 |
Passed: Mechanical - Rough In |
|
Troy Crews |
6/8/2023 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Troy Crews |
6/8/2023 |
Passed: Fire - Fire Rated Wall |
|
Dwight Boozer |
8/21/2023 |
Passed: Electrical - Permanent Power |
|
Troy Crews |
9/21/2023 |
Release to power company |
|
Troy Crews |
9/21/2023 |
Passed: Electrical - Permanent Power |
|
Troy Crews |
9/27/2023 |
Passed: Fire - Aboveground Hydro - Sprinkler |
|
Joshua Wehinger |
2/1/2024 |
Passed: Electrical - Above Ceiling |
5 Th And 6 Floors Remove Temp Lighting |
Troy Crews |
2/28/2024 |
Passed: Electrical - Above Ceiling |
2 Nd 3 Rd 4th Floors |
Troy Crews |
3/7/2024 |
Passed: Electrical - Above Ceiling |
Call Back For Front Meeting Room |
Troy Crews |
4/24/2024 |
Passed: Electrical - Above Ceiling |
|
Troy Crews |
4/26/2024 |
Cancelled: Fire - Kitchen Hood – Fire Suppression Test |
|
Troy Crews |
7/11/2024 |
Passed: Building - Final |
Partial ,need Fire Final And Access To First Floor Rooms When Co Final Is Done With Fire Marshall. |
Troy Crews |
8/12/2024 |
Passed: Fire - Kitchen Hood – Fire Suppression Test |
|
Joshua Wehinger |
8/26/2024 |
Passed: Building - Final |
Partial Finished Guest Rooms First Floor, Need Fire Final, Elevator Final, Inspect Rooftop. |
Troy Crews |
9/12/2024 |
Cancelled: Fire - Fire Final |
|
Troy Crews |
9/12/2024 |
Certificate-Release Certificate |
|
Troy Crews |
11/7/2024 |
Passed: Fire - Fire Final |
Ok Per Ret Tompkins 11-7-24 |
Troy Crews |
11/7/2024 |
Passed: Building - Final |
Cannot Closed Permit Or Release Certificate Of Occupancy Due To Missing Required Documents. |
Troy Crews |
11/7/2024 |
(Requested) Fire-Operational Test - Fire Pump |
|
|
|