Inspection |
Notes |
Performed By |
Date |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Troy Crews |
5/9/2022 |
Cancelled: Building - Monolithic Slab |
|
Melissa Garber |
5/12/2022 |
Cancelled: Engineering - Setbacks |
|
Melissa Garber |
5/12/2022 |
Passed: Building - Monolithic Slab |
|
Troy Crews |
5/12/2022 |
Passed: Engineering - Setbacks |
|
Troy Crews |
5/12/2022 |
Passed: Building - Roof Decking |
|
Troy Crews |
7/15/2022 |
Passed: Building - Wall Sheathing |
|
Troy Crews |
7/15/2022 |
Failed: Building - Framing |
Truss A-04 Engineering Missing |
Troy Crews |
8/5/2022 |
Failed: Electrical - 2nd Rough-In |
Smoke Detector Wiring Not Complete 2 West Bedrooms And Hall |
Troy Crews |
8/5/2022 |
Failed: Mechanical - Rough In |
Nail Plates Needed On Both Sides Dryer Vent Pipe. |
Troy Crews |
8/5/2022 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Troy Crews |
8/5/2022 |
Failed: Building - Framing |
Still Missing Engineering On Ao Four Truss Call Back In With Insulation Inspection |
Troy Crews |
8/9/2022 |
Passed: Electrical - 2nd Rough-In |
Items Corrected |
Troy Crews |
8/9/2022 |
Passed: Mechanical - Rough In |
Items Corrected |
Troy Crews |
8/9/2022 |
Passed: Building - Framing |
Engineering Matches Plans Sent With Trusses |
Troy Crews |
8/9/2022 |
Passed: Building - Insulation |
|
Troy Crews |
8/16/2022 |
Passed: Electrical - Permanent Power |
|
Troy Crews |
11/8/2022 |
Release to power company |
|
Troy Crews |
11/8/2022 |
Release to power company |
|
Melissa Garber |
11/18/2022 |
Failed: Building - Final |
Need Outlet At Other End Of Double Vanity. |
Troy Crews |
12/8/2022 |
Passed: Building - Final |
Outlet Installed |
Troy Crews |
12/13/2022 |