Inspection |
Notes |
Performed By |
Date |
Passed: Engineering - Initial Driveway |
|
Smith, Blake |
3/29/2022 |
Passed: Building - Footer |
|
Matt Forsyth |
4/20/2022 |
Passed: Engineering - Setbacks |
|
Matt Forsyth |
4/20/2022 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Matt Forsyth |
4/28/2022 |
Passed: Building - Wall Sheathing |
|
Matt Forsyth |
7/27/2022 |
Passed: Building - Roof Decking |
|
Matt Forsyth |
7/27/2022 |
Passed: Building - Framing |
|
Matt Forsyth |
7/29/2022 |
Passed: Electrical - 2nd Rough-In |
|
Matt Forsyth |
8/11/2022 |
Failed: Mechanical - Rough In |
Need Gasket On All Penatrations |
Matt Forsyth |
8/11/2022 |
Failed: Plumbing/Gas - 2nd Rough-In |
No Pressure On Supply , Need Relieving Arch On Water Supply For Outside Faucet |
Matt Forsyth |
8/11/2022 |
Failed: Plumbing/Gas - Tub Set/Shower Pan |
Need Water In Tub |
Matt Forsyth |
8/11/2022 |
Passed: Building - Insulation |
Walls Only |
Matt Forsyth |
8/16/2022 |
Passed: Mechanical - Rough In |
Item Addressed |
Matt Forsyth |
8/16/2022 |
Passed: Plumbing/Gas - 2nd Rough-In |
Item Addressed |
Matt Forsyth |
8/16/2022 |
Passed: Electrical - Permanent Power |
Need Septic And Driveway To Complete |
Matt Forsyth |
9/21/2022 |
Passed: Electrical - Permanent Power |
Need Septic And Driveway |
Matt Forsyth |
10/3/2022 |
Release to power company |
|
Melissa Garber |
10/5/2022 |
Passed: Engineering - Final Driveway |
|
Smith, Blake |
10/5/2022 |
Septic Release Inspection |
|
Health Dept |
10/5/2022 |
Certificate-Release Certificate |
Recv'd Picture |
Anthony Aslan |
3/29/2023 |
Passed: Building - Final |
No Disconnect On Ahu And Water Heater (recv'd) |
Anthony Aslan |
3/29/2023 |