Permit Details

Permit Search

Permit

New Residential Construction

512 SW UPSTAGE GLN
LAKE CITY, FL 32024

Permit #
000043946
Application #
52844
Status Completed
  1. Submitted Dec 21, 2021
  2. Issued Mar 17, 2022
  3. Expires Jul 29, 2023
  4. Completed Jan 30, 2023

Property

Parcel #
09280-141
Owner
Dalton William, Dalton Sally
Acres
4.50
Subdivision
Oaks Of Lake City Phase 1
Zoning
PRRD
Flood zone
X
District
5

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Subdivision Plat
Finished floor requirement
75'
Requirement needed
By Nailing Inspection
Document needed is
a Surveyor letter giving the Finished Floor Elevation
Document receieved
Yes
Fema map number
12023C0395C
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Stories
1
Heated Area (Sqft)
3409
Total Area (Sqft)
5308
Building Height
26.8
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000)
22-0009
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Point Review - Printed-Online Application
  3. Point Review - Reviewed
  4. Plan Review - Documents Required
  5. Zoning Review - Corrections Needed
  6. Plan Review - Documents Required
  7. Zoning Review - Corrections Needed
  8. Plan Review - Plumbing Approved
  9. Plan Review - Mechanical Approved
  10. Plan Review - Electrical Approved
  11. Plan Review - Building Approved
  12. Plan Review - Reviewed
  13. Zoning Review - Corrections Needed
  14. Zoning Review - Corrections Needed
  15. Zoning Review - Corrections Needed
  16. Zoning Review - Corrections Needed
  17. Zoning Review - Reviewed
  18. Zoning Review - Reviewed
  19. Final Review - Reviewed
  20. Permit Issued
  21. Final Review - Payment Needed

Contractors

  • Isaiah Cully

    Ic Construction Llc

    License
    CBC1259655
    Title
    Building Contractor
    Role
    Contractor
  • Cody Barrs

    Barrs Plumbing Inc

    License
    CFC1427145
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Tyler M Turner

    Tmt Roofing Llc

    License
    CCC1330410
    Title
    Cert Roofing
    Role
    Subcontractor
  • Everton D Ruddock

    D&s Lighting Inc

    License
    EC13003800
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Clinton G Wilson

    Wilson Heat & Air Inc

    License
    CAC057886
    Title
    Class B A/c
    Role
    Subcontractor

Inspections

  1. Mar 17, 2022

    Cancelled: Engineering - Initial Driveway

    Inspected by Melissa Garber

  2. Mar 23, 2022

    Passed: Building - Footer

    Inspected by Troy Crews

  3. Mar 23, 2022

    Passed: Engineering - Setbacks

    Inspected by Troy Crews

  4. Apr 25, 2022

    Passed: Electrical - Temporary Service

    Inspected by Troy Crews

  5. Apr 25, 2022

    Release to power company

    Inspected by Troy Crews

  6. Apr 25, 2022

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Troy Crews

  7. Apr 28, 2022

    Passed: Building - Slab

    Inspected by Troy Crews

  8. May 27, 2022

    Passed: Building - Roof Decking

    Inspected by Anthony Aslan

  9. May 27, 2022

    Passed: Building - Wall Sheathing

    Inspected by Anthony Aslan

  10. Jun 24, 2022

    Septic Release Inspection

    Inspected by Health Dept

  11. Jun 29, 2022

    Passed: Building - Framing

    Inspected by Troy Crews

  12. Jul 22, 2022

    Passed: Electrical - 2nd Rough-In

    Inspected by Troy Crews

  13. Jul 22, 2022

    Passed: Mechanical - Rough In

    Inspected by Troy Crews

  14. Jul 22, 2022

    Passed: Plumbing/Gas - 2nd Rough-In

    Gas Line Needs To Be Tested By Gas Supplier Prior To Insulation

    Inspected by Troy Crews

  15. Jul 27, 2022

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Anthony Aslan

  16. Aug 12, 2022

    Passed: Building - Insulation

    Inspected by Troy Crews

  17. Nov 16, 2022

    Passed: Electrical - Permanent Power

    Need Driveway Final

    Inspected by Troy Crews

  18. Nov 23, 2022

    Release to power company

    Need Drive Final Prior To Co

    Inspected by Troy Crews

  19. Jan 10, 2023

    Failed: Building - Final

    Need Front Steps, Final Termite, Check Gfci At Front Porch Left Of Front Door Indicates Bot And Neutral Reversed, Also Check Gfci Plugs In Master Bath. Need Confirmation Large Glass For Shower Area Tempered, Not Installed Yet.

    Inspected by Troy Crews

  20. Jan 30, 2023

    Passed: Building - Final

    Inspected by Troy Crews

Documents