| Inspection |
Notes |
Performed By |
Date |
| Passed: Engineering - Initial Driveway |
|
Smith, Blake |
3/17/2022 |
| Cancelled: Engineering - Initial Driveway |
|
Melissa Garber |
3/17/2022 |
| Passed: Building - Footer |
|
Troy Crews |
3/23/2022 |
| Passed: Engineering - Setbacks |
|
Troy Crews |
3/23/2022 |
| Passed: Electrical - Temporary Service |
|
Troy Crews |
4/25/2022 |
| Release to power company |
|
Troy Crews |
4/25/2022 |
| Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Troy Crews |
4/25/2022 |
| Passed: Building - Slab |
|
Troy Crews |
4/28/2022 |
| Passed: Building - Roof Decking |
|
Anthony Aslan |
5/27/2022 |
| Passed: Building - Wall Sheathing |
|
Anthony Aslan |
5/27/2022 |
| Septic Release Inspection |
|
Health Dept |
6/24/2022 |
| Passed: Building - Framing |
|
Troy Crews |
6/29/2022 |
| Passed: Electrical - 2nd Rough-In |
|
Troy Crews |
7/22/2022 |
| Passed: Mechanical - Rough In |
|
Troy Crews |
7/22/2022 |
| Passed: Plumbing/Gas - 2nd Rough-In |
Gas Line Needs To Be Tested By Gas Supplier Prior To Insulation |
Troy Crews |
7/22/2022 |
| Passed: Plumbing/Gas - 2nd Rough-In |
|
Anthony Aslan |
7/27/2022 |
| Passed: Building - Insulation |
|
Troy Crews |
8/12/2022 |
| Passed: Electrical - Permanent Power |
Need Driveway Final |
Troy Crews |
11/16/2022 |
| Release to power company |
Need Drive Final Prior To Co |
Troy Crews |
11/23/2022 |
| Passed: Engineering - Final Driveway |
Will Not Get Final Co Until Culvert And Driveway Or Complete. |
Smith, Blake |
11/23/2022 |
| Failed: Building - Final |
Need Front Steps, Final Termite, Check Gfci At Front Porch Left Of Front Door Indicates Bot And Neutral Reversed, Also Check Gfci Plugs In Master Bath. Need Confirmation Large Glass For Shower Area Tempered, Not Installed Yet. |
Troy Crews |
1/10/2023 |
| Passed: Building - Final |
|
Troy Crews |
1/30/2023 |