Permit Details

Permit Search

Permit

Roof Replacement or Repair

387 SW KEMP CT
LAKE CITY, FL 32024

Permit #
000043889
Application #
53837
Status Completed
  1. Submitted Mar 9, 2022
  2. Issued Mar 10, 2022
  3. Expires Sep 18, 2022
  4. Completed Mar 22, 2022

Property

Parcel #
03612-000
Owner
Roder Linda
Acres
3.43
Subdivision
—
Zoning
A-3
Flood zone
X
District
5

Permit

Status
Completed
Septic release
N/A
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0395C
Type Roofing Job
Overlay with Metal
Further Job Details (Explain if decking is being replaced and or Repairs are being done.)
Installing snap-lock panels over synthetic felt on top of existing 3 tab shingles (1 layer)
Type of structure
House
Commercial or Residential
Residential
Roof Area (for this job) Sq Ft
1060
No. of Stories
1
Roof Pitch
4:12 or Greater
Is the existing roof being removed?
No
Explain if not removing the existing roofing material?
Installing snap-lock panels over synthetic felt on top of existing 3 tab shingles (1 layer)
Type of New Roofing Product
Metal
Florida Product Approval Number
FL 33818.2
Product Manufacturer
Gulf Coast Supply
Product Description
Gulf Lok metal roof panel
Building Code Edition
2020 Florida Building Code 7th Edition and Florida Statute 553.844
Sealed roof decking options: (Must select an option.)
Other (explain)
Sealed roof decking explanation for other option.
Existing shingle roof is not being removed. One layer of synthetic felt to be installed over shingles.
Ventilation:
Ridge Vent
Flashing:
Replace All
Drip Edge:
Replace All
Valley Treatment:
Use Existing
Any cable and/or race-way wiring located on or within the roof assembly?
No

Status & Review History

  1. Application pending.
  2. Point Review - Processing
  3. Final Review - Payment Needed
  4. Permit Issued

Contractors

  • Caleb Laughlin

    Precision Exteriors Llc

    License
    CCC1327718
    Title
    Roofing Contractor
    Role
    Contractor

    County License & State License & Liability Insurance Expired.

Inspections

  1. Mar 15, 2022

    Passed: Re-Roof - In Progress

    Inspected by Matt Forsyth

  2. Mar 22, 2022

    Passed: Re-Roof - Final

    Inspected by Matt Forsyth