| Passed: Engineering - Setbacks |
|
Anthony Aslan |
4/4/2022 |
| Failed: Building - Footer |
Not Ready |
Anthony Aslan |
4/4/2022 |
| Passed: Engineering - Setbacks |
|
Anthony Aslan |
4/5/2022 |
| Passed: Building - Footer |
|
Anthony Aslan |
4/5/2022 |
| Passed: Building - Slab |
Need Termite Ticket |
Anthony Aslan |
5/10/2022 |
| Passed: Building - Roof Decking |
|
Anthony Aslan |
6/13/2022 |
| Passed: Building - Wall Sheathing |
|
Anthony Aslan |
6/13/2022 |
| Passed: Building - Framing |
|
Anthony Aslan |
6/30/2022 |
| Passed: Electrical - 2nd Rough-In |
|
Anthony Aslan |
7/11/2022 |
| Passed: Building - Insulation |
|
Anthony Aslan |
7/18/2022 |
| Septic Release Inspection |
|
Health Dept |
8/23/2022 |
| Passed: Electrical - Permanent Power |
Wires Safety Off In Main House |
Anthony Aslan |
9/14/2022 |
| Passed: Building - Final |
|
Anthony Aslan |
10/21/2022 |