Mobile Home
Permit
| Application #: | 52919 |
| Permit #: |
000043766 |
| Related Permit: |
|
| Submitted: | Monday, December 20, 2021 |
| Issued: | Wednesday, February 23, 2022 |
| Expires: | Wednesday, September 20, 2023 |
| Completed: | Wednesday, September 20, 2023 |
| Status: |
Completed |
| Septic Release? |
Yes |
Job Details
| Elevation regulation |
Minimum Requirement |
| Finished floor requirement |
One foot above the road |
| Fema map number |
12023C0459C |
| In floodway |
N |
| Mobile Home is a: |
Double Wide |
| Year Built |
1995 |
| Width (Ft.In) |
24 |
| Length (Ft.In) |
40 |
| Driveway access to home: |
Existing Drive |
| Installation Decal # |
72950 |
| Septic # |
21-0982 |
| Setbacks Front |
30' |
| Setback Side 1 |
10' |
| Setbacks Rear |
25' |
| Dev Permit # |
F023- |
| Setback Side 2 |
10' |
| Are you applying for a 5 year temporary permit? |
No |
| Serial # |
fp1034-338281ab |
| Wind Zone? |
2 |
| Residential or Commercial Use? |
Residential |
Review Notes
| 12/21/2021 |
Plan Review - Reviewed |
| 12/21/2021 |
Zoning Review - Reviewed |
| 12/21/2021 |
Point Review - Printed-Online Application |
| 12/21/2021 |
Point Review - Reviewed |
| 12/22/2021 |
Final Review - Documents Required |
| 2/2/2022 |
Final Review - Documents Required |
| 2/23/2022 |
Final Review - Payment Needed |
| 2/23/2022 |
Permit Issued |
Contractors
| Name / Business |
License |
Title |
Role |
Damarquis A Williams
|
IH1128217 |
Mh Installer (ih) |
Contractor |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Passed: Mobile Home - In County Pre-Mobile Home before set-up |
Mobile Home Wil. Need Some Interior Work Mainly Getting Rid Of Mold Two Pass Final Inspection |
Matt Forsyth |
2/9/2022 |
| Failed: Mobile Home - Mobile Home Set-Up Final |
Moble Home Still Needs Work Done |
Matt Forsyth |
8/21/2023 |
| Passed: Engineering - Setbacks |
|
Matt Forsyth |
8/21/2023 |
| Septic Release Inspection |
|
Health Dept |
9/12/2023 |
| Passed: Mobile Home - Mobile Home Set-Up Final |
|
Matt Forsyth |
9/20/2023 |
| Release to power company |
|
Matt Forsyth |
9/20/2023 |
| Passed: Engineering - Setbacks |
|
Matt Forsyth |
9/20/2023 |