Permit Details

Permit Search

Permit

Roof Replacement or Repair

315 NW BROWN RD
LAKE CITY, FL 32055

Permit #
000043699
Application #
53499
Status Completed
  1. Submitted Feb 14, 2022
  2. Issued Feb 14, 2022
  3. Expires Aug 21, 2022
  4. Completed Feb 22, 2022

Property

Parcel #
02377-003
Owner
Wayword Ministries Of Lake City, Florida Inc
Acres
5.27
Subdivision
—
Zoning
RSF-2
Flood zone
X
District
3

Permit

Status
Completed
Septic release
N/A
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0280D
Type Roofing Job
Replacement - Tear off Existing and Replace
Type of structure
Commercial Building
Commercial or Residential
Commercial
Roof Area (for this job) Sq Ft
38
No. of Stories
1
Roof Pitch
4:12 or Greater
Is the existing roof being removed?
Yes
Type of New Roofing Product
Asphalt Shingles
Florida Product Approval Number
fl10674-r13
Product Manufacturer
Owens Corning
Product Description
Architectural Shingles
Building Code Edition
2020 Florida Building Code 7th Edition and Florida Statute 553.844
Sealed roof decking options: (Must select an option.)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Ventilation:
Ridge Vent
Flashing:
Replace All
Drip Edge:
Replace All
Valley Treatment:
New Metal
Any cable and/or race-way wiring located on or within the roof assembly?
No

Status & Review History

  1. Application pending.
  2. City of Lake City
  3. Final Review - Payment Needed
  4. Permit Issued

Contractors

  • Tyler M Turner

    Tmt Roofing Llc

    License
    CCC1330410
    Title
    Cert Roofing
    Role
    Contractor

Inspections

  1. Feb 16, 2022

    Passed: Re-Roof - In Progress

    Inspected by Troy Crews

  2. Feb 22, 2022

    Passed: Re-Roof - Final

    Inspected by Matt Forsyth