Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 664 SW APPALACHEE TER
FORT WHITE, FL 32038
Parcel #: 03766-106
Acres: 10.01
Owner: Turner Michael, Turner Carrie
Subdivision: Appalachie Trace Unr
Zoning: A-3
Flood Zone: X
District: 4
Application #: 53236
Permit #: 000043677
Related Permit:
Submitted: Tuesday, January 25, 2022
Issued: Wednesday, February 9, 2022
Expires: Monday, October 31, 2022
Completed: Monday, October 31, 2022
Status: Completed
Septic Release? Yes
Notes:
MECHANICAL AT INWULATION SPACE AT SUPPLY & RETURN PLENUMS
Job Details
Finished floor requirement
Fema map number 12023C0270C
Type Roofing Job Replacement - Tear off Existing and Replace
Type of structure House
Commercial or Residential Residential
Roof Area (for this job) Sq Ft 61.45
No. of Stories 1
Roof Pitch 4:12 or Greater
Is the existing roof being removed? Yes
Type of New Roofing Product Asphalt Shingles
Florida Product Approval Number FL10124.1
Product Manufacturer GAF
Product Description Timberline UHDZ shingles
Building Code Edition 2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Sealed roof decking options: (Must select an option.) two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Ventilation: Ridge Vent
Flashing: Use Existing
Drip Edge: Replace All
Valley Treatment: New Metal
Any cable and/or race-way wiring located on or within the roof assembly? No
Review Notes
1/25/2022 Application pending.
1/31/2022 Point Review - Printed-Online Application
1/31/2022 Plan Review - Building Approved NEEDED: EH PAPERWORK
1/31/2022 Plan Review - Electrical Approved NEEDED: EH PAPERWORK
1/31/2022 Plan Review - Mechanical Approved NEEDED: EH PAPERWORK
1/31/2022 Plan Review - Plumbing Approved NEEDED: EH PAPERWORK
1/31/2022 Plan Review - Reviewed NEEDED: EH PAPERWORK
2/1/2022 Zoning Review - Reviewed NEEDED: EH PAPERWORK
2/1/2022 Final Review - Documents Required BUZBEE: NEEDED: EH PAPERWORK OWNER /CONTRACTOR SIGNATURE PAGE IS NEEDED!! - IT IS BLANK!! - PLEASE GATHER SIGNATURES & RE-UPLOAD
2/9/2022 Final Review - Payment Needed
2/9/2022 Permit Issued Permit #000043677 created and approved.
8/9/2022 Final Review - Payment Needed
Contractors
Name/ Business License Title Role
Joel G Buzbee
G Buzbee, Inc
Workers Comp Expired.
CGC061980 Cert General Contractor
Paul K Coleman
Colemans Plumbing Inc.
CFC1425624 Certified Plumbing Subcontractor
Chad White
Ck Electric Llc
County License & State License & Liability Insurance Expired.
EC13002222 Electrical Contractor Subcontractor
Donald R Davis
High Springs Electric Inc
CAC1815367 Class B A/c Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Engineering - Setbacks Anthony Aslan 2/23/2022
Passed: Building - Footer Anthony Aslan 2/23/2022
Failed: Electrical - Temporary Service Electrical Contractor Does Not Have Temporary Power Built Matt Forsyth 2/28/2022
Passed: Electrical - Temporary Service Anthony Aslan 3/2/2022
Release to power company Anthony Aslan 3/2/2022
Passed: Plumbing/Gas - 1st Underground Rough–In Anthony Aslan 3/18/2022
Passed: Building - Slab Anthony Aslan 3/29/2022
Cancelled: Building - Roof Decking Anthony Aslan 5/4/2022
Failed: Building - Framing Not Finished, Beams On Porch Nailed 10"on Top And Bottom Dormers Not Complete Matt Forsyth 5/4/2022
Failed: Building - Roof Decking Matt Forsyth 5/4/2022
Passed: Building - Wall Sheathing Matt Forsyth 5/4/2022
Passed: Building - Roof Decking Matt Forsyth 5/6/2022
Failed: Building - Framing Need Truss Piggyback 4' Scab Tying Top Cord Of Trusses Together. Gable Strapping Needed Matt Forsyth 5/13/2022
Passed: Electrical - 2nd Rough-In Matt Forsyth 5/26/2022
Failed: Mechanical - Rough In Need 3inch Clearance Around Plenum Matt Forsyth 5/26/2022
Failed: Plumbing/Gas - 2nd Rough-In Need Pressure On Gas And Water Supply Matt Forsyth 5/26/2022
Passed: Plumbing/Gas - Tub Set/Shower Pan Tub Water Tested Matt Forsyth 5/26/2022
Passed: Plumbing/Gas - 2nd Rough-In Anthony Aslan 6/13/2022
Passed: Building - Framing Anthony Aslan 6/13/2022
Passed: Electrical - 2nd Rough-In Anthony Aslan 6/13/2022
Passed: Building - Insulation Dormer Windows Not Foamed, A/c Duct Over Attic Access Needs To Be Moved Anthony Aslan 6/23/2022
Passed: Electrical - Permanent Power Need Septic Release Matt Forsyth 8/10/2022
Release to power company Melissa Garber 9/1/2022
Septic Release Inspection Health Dept 9/1/2022
Passed: Building - Final Outlet Right Of Stove Hot/neutral Reversed Anthony Aslan 10/31/2022
Documents
File Name Date File Size