Inspection |
Notes |
Performed By |
Date |
Passed: Engineering - Initial Driveway |
|
Smith, Blake |
2/7/2022 |
Passed: Electrical - Temporary Service |
|
Anthony Aslan |
2/23/2022 |
Release to power company |
|
Anthony Aslan |
2/23/2022 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Anthony Aslan |
4/5/2022 |
Cancelled: Electrical - Temporary Service |
|
Anthony Aslan |
4/11/2022 |
Passed: Engineering - Setbacks |
Tight Lot Lines Confirmed By Surveyor |
Anthony Aslan |
4/11/2022 |
Passed: Building - Monolithic Slab |
|
Anthony Aslan |
4/11/2022 |
Passed: Building - Roof Decking |
|
Anthony Aslan |
5/13/2022 |
Passed: Building - Wall Sheathing |
|
Anthony Aslan |
5/13/2022 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Anthony Aslan |
5/31/2022 |
Failed: Building - Framing |
Anchors At Splice Under Window Marked Red Marker, Plumbing In Garage More Than 50% Top Plate Notched Tension Strap & Studs Notched More Than 40-60% Double Styd |
Anthony Aslan |
5/31/2022 |
Passed: Building - Framing |
|
Anthony Aslan |
6/7/2022 |
Passed: Electrical - 2nd Rough-In |
Need Nail Guard On Service Wire Entrance |
Anthony Aslan |
8/18/2022 |
Failed: Plumbing/Gas - Tub Set/Shower Pan |
No Water In Tubs |
Anthony Aslan |
8/18/2022 |
Passed: Mechanical - Rough In |
|
Anthony Aslan |
8/18/2022 |
Passed: Building - Insulation |
Spray Foam Attic |
Anthony Aslan |
9/1/2022 |
Passed: Electrical - Permanent Power |
Need Driveway & Septic Release |
Anthony Aslan |
2/23/2023 |
Passed: Engineering - Final Driveway |
|
Smith, Blake |
4/10/2023 |
Release to power company |
|
Melissa Garber |
4/24/2023 |
Septic Release Inspection |
|
Health Dept |
4/24/2023 |
Passed: Building - Final |
Need Final Termite
picture Of Back Flow Hose Bib |
Anthony Aslan |
2/23/2024 |
Certificate-Release Certificate |
Rec'vd Documents |
Anthony Aslan |
2/26/2024 |