Inspection |
Notes |
Performed By |
Date |
Failed: Engineering - Final Driveway |
Needs To Add Concrete Mitred Ends |
Smith, Blake |
1/20/2022 |
Passed: Building - Footer |
|
Troy Crews |
1/27/2022 |
Passed: Engineering - Setbacks |
|
Troy Crews |
1/27/2022 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Troy Crews |
2/18/2022 |
Passed: Building - Slab |
|
Troy Crews |
3/4/2022 |
Failed: Building - Ext Strapping/Wall Sheathing |
Back Porch Beam And Post Not Installed, House Wrapped Before Inspected |
Anthony Aslan |
5/12/2022 |
Failed: Building - Framing |
Stud Packs Missing On Girder Truss, Anchors Missing Inside Garage Wall And Bottom Splices, Have Question About 6" Headers Nothing On Plans. |
Anthony Aslan |
5/12/2022 |
Passed: Electrical - 2nd Rough-In |
|
Anthony Aslan |
5/19/2022 |
Passed: Mechanical - Rough In |
|
Anthony Aslan |
5/19/2022 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Anthony Aslan |
5/19/2022 |
Passed: Building - Framing |
Corrections Made. Check Back Porch Post At Insulation |
Anthony Aslan |
5/19/2022 |
Passed: Building - Insulation |
Back Porch Post Installed And Strapped |
Anthony Aslan |
6/16/2022 |
Failed: Electrical - Permanent Power |
No Garage Door, Need Septic Release, Need Driveway Final. |
Anthony Aslan |
8/2/2022 |
Septic Release Inspection |
|
Health Dept |
8/9/2022 |
Passed: Engineering - Final Driveway |
|
Smith, Blake |
8/10/2022 |
Passed: Electrical - Permanent Power |
Door Installed |
Troy Crews |
8/12/2022 |
Release to power company |
|
Troy Crews |
8/12/2022 |
Passed: Building - Final |
Need Blower Door And Final Termite. |
Anthony Aslan |
9/20/2022 |
Certificate-Release Certificate |
|
Anthony Aslan |
9/21/2022 |