Inspection |
Notes |
Performed By |
Date |
Passed: Engineering - Initial Driveway |
|
Smith, Blake |
1/14/2022 |
Passed: Building - Footer |
Need Building Permit And Notice Of Commencement Documents On Site |
Matt Forsyth |
2/9/2022 |
Passed: Engineering - Setbacks |
|
Matt Forsyth |
2/9/2022 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
Need Compaction Test For Slab Needs To Be Compacted |
Matt Forsyth |
2/25/2022 |
Passed: Building - Slab |
Slab Compacted |
Matt Forsyth |
3/1/2022 |
Passed: Building - Ext Strapping/Wall Sheathing |
|
Troy Crews |
5/25/2022 |
Passed: Building - Framing |
|
Troy Crews |
5/25/2022 |
Passed: Building - Roof Decking |
|
Troy Crews |
5/25/2022 |
Failed: Electrical - Temporary Service |
No Ground Rod |
Troy Crews |
5/25/2022 |
Failed: Electrical - Temporary Service |
Ground Wire Not Connected |
Matt Forsyth |
5/27/2022 |
Passed: Electrical - Temporary Service |
|
Matt Forsyth |
6/2/2022 |
Release to power company |
|
Matt Forsyth |
6/2/2022 |
Passed: Electrical - 2nd Rough-In |
|
Matt Forsyth |
7/7/2022 |
Failed: Mechanical - Rough In |
Exhaust Duct Not Run |
Matt Forsyth |
7/7/2022 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Matt Forsyth |
7/7/2022 |
Failed: Mechanical - Rough In |
All Duct Penetrating Ceiling Need 3inch Clearance Minimum |
Matt Forsyth |
7/13/2022 |
Passed: Building - Insulation |
Make Sure Fresh Air Duct For Fireplace Gets Run To Outside Got Disconnected During Insulation. |
Troy Crews |
8/4/2022 |
Passed: Engineering - Final Driveway |
|
Smith, Blake |
2/23/2023 |
Passed: Electrical - Permanent Power |
Septic And Driveway Are Needed |
Matt Forsyth |
2/23/2023 |
Release to power company |
|
Melissa Garber |
2/28/2023 |
Septic Release Inspection |
|
Health Dept |
2/28/2023 |
Passed: Building - Final |
Termite Final Treatment , Review Of Blower Door Test Needed |
Matt Forsyth |
6/26/2023 |
Certificate-Release Certificate |
|
Matt Forsyth |
9/7/2023 |