Inspection |
Notes |
Performed By |
Date |
Passed: Building - Footer |
|
Troy Crews |
1/19/2022 |
Passed: Engineering - Setbacks |
|
Troy Crews |
1/19/2022 |
Passed: Electrical - Temporary Service |
|
Matt Forsyth |
2/7/2022 |
Release to power company |
|
Matt Forsyth |
2/7/2022 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Troy Crews |
2/8/2022 |
Passed: Building - Slab |
|
Troy Crews |
2/18/2022 |
Failed: Building - Framing |
Wall And Roof Sheathing Inspection Failed Shiners Need To Be Removed And Re Nailed Wall And Roof |
Matt Forsyth |
3/28/2022 |
Failed: Building - Framing |
Missing Anchor Bolts ,truss Strapping,garage Holdown Need Porch Headers Nailed 12" On Center Top And Bottom |
Matt Forsyth |
3/30/2022 |
Failed: Building - Framing |
Garage Portel Holdown Not Built To Drawings. Porch Beams Nailed Both Sides 12"oc Top And Bottom. |
Matt Forsyth |
4/6/2022 |
Passed: Building - Framing |
Items Addressed |
Matt Forsyth |
4/7/2022 |
Passed: Engineering - Initial Driveway |
|
Smith, Blake |
5/17/2022 |
Passed: Building - Roof Decking |
|
Troy Crews |
5/24/2022 |
Passed: Electrical - 2nd Rough-In |
|
Troy Crews |
5/24/2022 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Troy Crews |
5/24/2022 |
Passed: Mechanical - Rough In |
|
Troy Crews |
5/24/2022 |
Passed: Building - Insulation |
Walls Only |
Matt Forsyth |
6/14/2022 |
Failed: Electrical - Permanent Power |
Need Garage Door Installed Also Septic And Drive Releases |
Matt Forsyth |
10/24/2022 |
Passed: Engineering - Final Driveway |
|
Smith, Blake |
10/25/2022 |
Septic Release Inspection |
|
Health Dept |
10/25/2022 |
Passed: Electrical - Permanent Power |
|
Matt Forsyth |
10/31/2022 |
Release to power company |
|
Matt Forsyth |
10/31/2022 |
Passed: Building - Final |
Waiting On Final Termite Treatment To Release Co |
Matt Forsyth |
12/14/2022 |
Passed: Building - Final |
|
Matt Forsyth |
12/20/2022 |