- Finished floor requirement
-
- Fema map number
- 12023C0415C
- Type Roofing Job
- Replacement - Tear off Existing and Replace
- Further Job Details (Explain if decking is being replaced and or Repairs are being done.)
- Tearing off current metal roof only. Not tearing off shingles underneath. Doing metal roof over shingles.
- Type of structure
- Mobile Home
- Commercial or Residential
- Residential
- Roof Area (for this job) Sq Ft
- 786
- No. of Stories
- 1
- Roof Pitch
- 2:12 to 4:12
- Is the existing roof being removed?
- Yes
- Explain if not removing the existing roofing material?
- Removing only current metal roof, not shingles.
- Type of New Roofing Product
- Metal
- Florida Product Approval Number
- 4595.19
- Product Manufacturer
- Tri-County Metals
- Product Description
- 29g Ultra-Rib over 1x4 purlins over plywood/shingles
- Building Code Edition
- 2020 Florida Building Code 7th Edition and Florida Statute 553.844
- Sealed roof decking options: (Must select an option.)
- Other (explain)
- Sealed roof decking explanation for other option.
- Metal roof over shingles. No underlayment.
- Ventilation:
- Ridge Vent
- Flashing:
- Replace All
- Drip Edge:
- Replace All
- Valley Treatment:
- New Metal