Inspection |
Notes |
Performed By |
Date |
Passed: Engineering - Initial Driveway |
|
Smith, Blake |
12/29/2021 |
Passed: Engineering - Setbacks |
Tight Lot Lines Verify By Surveyor |
Anthony Aslan |
12/29/2021 |
Passed: Building - Footer |
|
Anthony Aslan |
12/29/2021 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Anthony Aslan |
1/14/2022 |
Passed: Building - Slab |
|
Anthony Aslan |
1/18/2022 |
Passed: Electrical - 2nd Rough-In |
|
Anthony Aslan |
4/6/2022 |
Passed: Mechanical - Rough In |
Need Nail Guard Dryer Pipe |
Anthony Aslan |
4/6/2022 |
Passed: Plumbing/Gas - 2nd Rough-In |
No Water In Tub |
Anthony Aslan |
4/6/2022 |
Failed: Building - Framing |
Missing Ltt Straps On Garage, Need Letter Garage Double Bottom Plate On Plans, Electrical Service Entrance Wire More Than 50% Bearing Top Plate Notched Or Drilled |
Anthony Aslan |
4/6/2022 |
Passed: Building - Framing |
Waiting On Bottom Plate Letter |
Anthony Aslan |
4/21/2022 |
Passed: Building - Insulation |
Inspected 4-21-22 Walls Only |
Anthony Aslan |
4/22/2022 |
Septic Release Inspection |
|
Health Dept |
6/27/2022 |
Cancelled: Electrical - Permanent Power |
|
Melissa Garber |
6/28/2022 |
Passed: Electrical - Permanent Power |
Need Driveway Final- Rec'd |
Anthony Aslan |
6/29/2022 |
Passed: Engineering - Final Driveway |
Nspection Was Made Only Of The Construction Of The Culvert And Related Concrete Work. Inspection Did Not Include The Surface Water Management System, Ditch Work, Slopes, Elevations, Or Any Other Matter Concerning Drainage At Or Around The Subject Property. This Document Shall Not Be Construed To Reflect Any Opinion Of The Inspector Other Than The Construction Of The Culvert In Accordance With The Permit. |
Smith, Blake |
7/1/2022 |
Release to power company |
|
Melissa Garber |
7/6/2022 |
Passed: Building - Final |
Need Blower Door Test |
Anthony Aslan |
8/12/2022 |
Certificate-Release Certificate |
Recv'd Blower Door Test |
Anthony Aslan |
8/15/2022 |