Permit Details

Permit Search

Permit

New Residential Construction

137 SW PHLOX GLN
LAKE CITY, FL 32024

Permit #
000043364
Application #
52160
Status Completed
  1. Submitted Oct 22, 2021
  2. Issued Dec 13, 2021
  3. Expires Jan 31, 2023
  4. Completed Aug 4, 2022

Property

Parcel #
08898-117
Owner
Arata Jessica M
Acres
1.01
Subdivision
Wester Woods Phase 1
Zoning
RSF-1
Flood zone
X
District
5

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0381D
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
25'
Setback Side 1
10'
Setback Side 2
10
Setbacks Rear
15'
Stories
1
Heated Area (Sqft)
1930
Total Area (Sqft)
2643
Building Height
20
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000)
21-0931
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.

Status & Review History

  1. Application pending.
  2. Point Review - Printed-Online Application
  3. Point Review - On Hold-Incomplete
  4. Point Review - On Hold-Incomplete
  5. Point Review - On Hold-Incomplete
  6. Point Review - Printed-Online Application
  7. Point Review - Reviewed
  8. Plan Review - Building Approved
  9. Plan Review - Electrical Approved
  10. Plan Review - Mechanical Approved
  11. Plan Review - Plumbing Approved
  12. Plan Review - Reviewed
  13. Zoning Review - Reviewed
  14. Zoning Review - Reviewed
  15. Final Review - Documents Required
  16. Final Review - Payment Needed
  17. Permit Issued
  18. Final Review - Payment Needed

Contractors

  • Bryan Zecher

    Bryan Zecher Homes Inc

    License
    CBC1257343
    Title
    Building Contractor
    Role
    Contractor
  • Cody Barrs

    Barrs Plumbing Inc

    License
    CFC1427145
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Robert Ogles

    Ogles Roofing & Construction Llc

    License
    CCC1328699
    Title
    Cert Roofing
    Role
    Subcontractor

    County License & State License Expired.

  • Marcus Matthews

    Matthews Electric Llc

    License
    EC13005459
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Anthony R Franks

    Franks & Lane Heating And Air Llc

    License
    CAC1818631
    Title
    Cert. A/c Class “b”
    Role
    Subcontractor

    County License & State License Expired.

Inspections

  1. Dec 23, 2021

    Passed: Building - Footer

    Inspected by Troy Crews

  2. Dec 23, 2021

    Passed: Engineering - Setbacks

    Inspected by Troy Crews

  3. Jan 6, 2022

    Passed: Electrical - Temporary Service

    Inspected by Troy Crews

  4. Jan 6, 2022

    Release to power company

    Inspected by Troy Crews

  5. Feb 7, 2022

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Troy Crews

  6. Feb 18, 2022

    Passed: Building - Slab

    Inspected by Anthony Aslan

  7. Mar 16, 2022

    Passed: Building - Wall Sheathing

    Inspected by Anthony Aslan

  8. Mar 16, 2022

    Rescheduled 3/16/2022:Building - Roof Decking

    Inspected by Anthony Aslan

  9. Mar 16, 2022

    Passed: Building - Roof Decking

    Inspected by Anthony Aslan

  10. Mar 31, 2022

    Failed: Building - Framing

    -anchors Missing On Bottom Plate Left Side House. -truss Missing Engineering A01, A02, A03, A08, A09, A09 -truss Repair Need A10

    Inspected by Anthony Aslan

  11. Apr 12, 2022

    Passed: Building - Framing

    Electrical Service Wire More Than 50% Of Bearing Wall Notched Or Drilled

    Inspected by Anthony Aslan

  12. Apr 12, 2022

    Passed: Electrical - 2nd Rough-In

    Inspected by Anthony Aslan

  13. Apr 12, 2022

    Passed: Mechanical - Rough In

    Missing Gasket Supply Boot Laundry

    Inspected by Anthony Aslan

  14. Apr 12, 2022

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Anthony Aslan

  15. Apr 21, 2022

    Passed: Building - Insulation

    Missing Insulation Under Window, Master Double Window Missing Foam Left Side

    Inspected by Anthony Aslan

  16. Jul 1, 2022

    Passed: Electrical - Permanent Power

    Need Septic Final

    Inspected by Troy Crews

  17. Jul 5, 2022

    Release to power company

    Inspected by Melissa Garber

  18. Jul 5, 2022

    Septic Release Inspection

    Inspected by Health Dept

  19. Aug 4, 2022

    Passed: Building - Final

    Inspected by Anthony Aslan

Documents