Permit Details

Permit Search

Permit

Mobile Home

2351 NW SUWANNEE VALLEY RD
LAKE CITY, FL 32055

Permit #
000043358
Application #
52642
Status Completed
  1. Submitted Nov 22, 2021
  2. Issued Dec 10, 2021
  3. Expires Jul 20, 2022
  4. Completed Jan 26, 2022

Property

Parcel #
01660-003
Owner
Fbd Inc-contract For Deed-tabitha Durden (jerry Greene-mh)
Acres
13.19
Subdivision
Levings Unr
Zoning
A-3
Flood zone
0.2 PCT ANNUAL CHANCE FLOOD HAZARD
District
1

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Special Lot Conditions
Finished floor requirement
SAME ELEVATION AS THE EXISTING MH ON LOT Meet existing structure
Fema map number
12023C0186D
In floodway
N
Mobile Home is a:
Single Wide
Year Built
1990
Width (Ft.In)
14
Length (Ft.In)
66
Driveway access to home:
Existing Drive
Installation Decal #
80747
Special temporary use permit number:
STUP2111-72
Septic #
21-0820
Setbacks Front
30'
Setback Side 1
25'
Setbacks Rear
25'
Dev Permit #
F023-
Setback Side 2
25'
Are you applying for a 5 year temporary permit?
Yes
Serial #
GAFLK07A19026VN
Wind Zone?
2
Residential or Commercial Use?
Residential

Status & Review History

  1. Point Review - Status Cleared
  2. Point Review - Received-Hard Copy Application
  3. Zoning Review - Reviewed
  4. Plan Review - Reviewed
  5. Zoning Review - Reviewed
  6. Final Review - Contact the Building Dept
  7. Final Review - Complete
  8. Permit Issued

Contractors

  • Dale Houston

    Dale Houstons Mobile Home Set Up And Service

    License
    IH1025142
    Title
    Mh Installer (ih)
    Role
    Contractor

Inspections

  1. Dec 8, 2021

    Passed: Mobile Home - In County Pre-Mobile Home before set-up

    Zone 2 In Back Bedroom Closet.

    Inspected by Troy Crews

  2. Jan 21, 2022

    Passed: Mobile Home - Mobile Home Set-Up Final

    Need Septic Final, House Higher Than Existing Home.

    Inspected by Troy Crews

  3. Jan 21, 2022

    Passed: Engineering - Setbacks

    Inspected by Troy Crews

  4. Jan 26, 2022

    Certificate-Release Certificate

    Inspected by Troy Crews

  5. Jan 26, 2022

    Septic Release Inspection

    Inspected by Health Dept

  6. Feb 14, 2022

    Release to power company

    Inspected by Melissa Garber