Permit Details

Permit Search

Permit

Roof Replacement or Repair

191 SW SHADY OAK WAY
LAKE CITY, FL 32024

Permit #
000043355
Application #
52813
Status Permit Issued This permit expired on Jun 14, 2022.
  1. Submitted Dec 10, 2021
  2. Issued Dec 10, 2021
  3. Expires Jun 14, 2022
  4. Completed —

Property

Parcel #
03079-005
Owner
Brown Millard F
Acres
0.50
Subdivision
Shady Oaks Acres Unit 1
Zoning
RSF-2
Flood zone
X
District
3

Permit

Status
Permit Issued
Septic release
N/A
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0380C
Type Roofing Job
Replacement - Tear off Existing and Replace
Type of structure
House
Commercial or Residential
Residential
Roof Area (for this job) Sq Ft
1512
No. of Stories
1
Roof Pitch
4:12 or Greater
Is the existing roof being removed?
Yes
Type of New Roofing Product
Asphalt Shingles
Florida Product Approval Number
FL10124-R27
Product Manufacturer
GAF
Product Description
Fiberglass reinforced asphalt shingle
Building Code Edition
2020 Florida Building Code 7th Edition and Florida Statute 553.844
Sealed roof decking options: (Must select an option.)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Ventilation:
Ridge Vent
Flashing:
Replace All
Drip Edge:
Replace All
Valley Treatment:
New Mineral Surface
Any cable and/or race-way wiring located on or within the roof assembly?
No

Status & Review History

  1. Application pending.
  2. Point Review - Processing
  3. Permit Issued

Contractors

  • Roger D Whiddon

    Whiddon Construction Co Inc

    License
    CCC1330273
    Title
    Roofing Contractor
    Role
    Contractor

Inspections

  1. Dec 16, 2021

    Passed: Re-Roof - In Progress

    Inspected by Matt Forsyth