Inspection |
Notes |
Performed By |
Date |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Troy Crews |
12/13/2021 |
Failed: Building - Footer |
Not Ready |
Troy Crews |
12/13/2021 |
Failed: Building - Monolithic Slab |
Not Ready |
Troy Crews |
12/13/2021 |
Passed: Engineering - Setbacks |
|
Troy Crews |
12/13/2021 |
Cancelled: Engineering - Setbacks |
|
Troy Crews |
12/13/2021 |
Cancelled: Building - Footer |
|
Anthony Aslan |
12/21/2021 |
Cancelled: Engineering - Setbacks |
|
Anthony Aslan |
12/21/2021 |
Passed: Engineering - Setbacks |
|
Anthony Aslan |
12/21/2021 |
Passed: Building - Monolithic Slab |
|
Anthony Aslan |
12/21/2021 |
Failed: Building - Ext Strapping/Wall Sheathing |
Missing Post On Back Porch, Sheathing Missing Nails Red Marker |
Anthony Aslan |
2/10/2022 |
Passed: Building - Wall Sheathing |
Exterior Strapping Good |
Anthony Aslan |
2/16/2022 |
Cancelled: Building - Roof Decking |
|
Melissa Garber |
2/17/2022 |
Passed: Building - Roof Decking |
|
Anthony Aslan |
2/17/2022 |
Passed: Building - Framing |
Broken Window Needs To Be Seal From Outside Of House |
Anthony Aslan |
3/16/2022 |
Passed: Electrical - 2nd Rough-In |
|
Anthony Aslan |
3/16/2022 |
Passed: Plumbing/Gas - Tub Set/Shower Pan |
|
Anthony Aslan |
3/16/2022 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Anthony Aslan |
3/16/2022 |
Failed: Mechanical - Rough In |
Need 3ft Between Supply And Return Ducts. Supply, Return Tap Collars, And Inter Liner Not Sealed To Collars |
Anthony Aslan |
3/17/2022 |
Passed: Mechanical - Rough In |
Some Mastic Missing On Flex Connections, Check At Wall Insulation. |
Anthony Aslan |
3/18/2022 |
Passed: Building - Insulation |
No Foam On Back Door Or Upper Windows In Living Room |
Anthony Aslan |
3/25/2022 |
Passed: Electrical - Permanent Power |
Need Septic Release, No Locks On Exterior Doors |
Anthony Aslan |
5/12/2022 |
Failed: Building - Final |
Electrical Was 5-12-22 Still Need Septic Release, Lock Installed |
Anthony Aslan |
6/7/2022 |
Release to power company |
|
Melissa Garber |
6/27/2022 |
Septic Release Inspection |
|
Health Dept |
6/27/2022 |
Cancelled: Electrical - Permanent Power |
|
Melissa Garber |
6/27/2022 |
Failed: Building - Final |
- Whole House Needs To Be Hot Checked Multiple Gfci Open Grounds, Open Neturals, Circuits Not Hot, Outlet Covers Off.
- No Water On House, No Carpet Installed In Down Stairs Rooms.
- 3 Fixed Pane Windows In Living Room Are Not Tempered Glass
r308.4.3glazing In Windows.
glazing In An Individual Fixed Or Operable Panel That Meets All Of The Following Conditions Shall Be Considered To Be A Hazardous Location:
1.the Exposed Area Of An Individual Pane Is Larger Than 9 Square Feet (0.836 M2),
2.the Bottom Edge Of The Glazing Is Less Than 18 Inches (457 Mm) Above The Floor,
3.the Top Edge Of The Glazing Is More Than 36 Inches (914 Mm) Above The Floor; And
4.one Or More Walking Surfaces Are Within 36 Inches (914 Mm), Measured Horizontally And In A Straight Line, Of The Glazing
- |
Anthony Aslan |
7/27/2022 |
Passed: Building - Final |
A/c Closet Left Of Stairs Does Not Have Switch At Opening For Light, 3 Windows Downstairs Waiting For Tempered Windows. |
Anthony Aslan |
8/1/2022 |
Certificate-Release Certificate |
Windows Corrected, Upstairs Light Switch Still Not Installed |
Anthony Aslan |
8/11/2022 |