Inspection |
Notes |
Performed By |
Date |
Passed: Building - Footer |
|
Troy Crews |
12/16/2021 |
Passed: Engineering - Setbacks |
Surveyor To Confirm Lines Not Strung |
Troy Crews |
12/16/2021 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Troy Crews |
1/24/2022 |
Passed: Building - Slab |
|
Troy Crews |
1/27/2022 |
Failed: Building - Framing |
Truss Screws Missing In Garage Area, Strapping Not Nailed Front Bedroom Ne Corner. Call Back In Prior To Insulation. |
Troy Crews |
6/21/2022 |
Passed: Electrical - 2nd Rough-In |
|
Troy Crews |
6/21/2022 |
Passed: Mechanical - Rough In |
|
Troy Crews |
6/21/2022 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Troy Crews |
6/21/2022 |
Passed: Building - Framing |
Items Corrected |
Troy Crews |
7/1/2022 |
Failed: Building - Insulation |
Not Done Call Back In Prior To Drywall |
Troy Crews |
7/1/2022 |
Passed: Building - Insulation |
|
Troy Crews |
7/12/2022 |
Passed: Electrical - Permanent Power |
|
Troy Crews |
1/12/2023 |
Release to power company |
|
Troy Crews |
1/12/2023 |
Failed: Building - Final |
Need Access To House Or Lock Box Code, And Ladder For Attic Inspection For Insulation, Or Letterhead From Insulation Contractor For R-value In Attic |
Troy Crews |
8/21/2024 |
Failed: Building - Final |
No Access Code Did Not Work |
Troy Crews |
9/3/2024 |
Failed: Building - Final |
Electric Not Connected To Water Heater |
Troy Crews |
9/30/2024 |
Certificate-Release Certificate |
|
Troy Crews |
10/18/2024 |
Rescheduled 10/18/2024:Building - Final |
|
Troy Crews |
10/18/2024 |
Passed: Building - Final |
Picture Sent In Of Water Heater Wiring Cannot Closed Permit Or Release Certificate Of Occupancy Due To Missing Required Documents. |
Troy Crews |
10/18/2024 |