Additions
Permit
| Application #: | 52281 |
| Permit #: |
000043247 |
| Related Permit: |
|
| Submitted: | Tuesday, October 26, 2021 |
| Issued: | Wednesday, November 24, 2021 |
| Expires: | Monday, June 13, 2022 |
| Completed: | Monday, June 13, 2022 |
| Status: |
Completed |
| Septic Release? |
No |
Job Details
| Elevation regulation |
Existing Building |
| Finished floor requirement |
Meet existing structure |
| Fema map number |
12023C0381D |
| Description of addition: |
bedroom & bathroom |
| Select driveway access to property: |
Existing Drive |
| Fire sprinklers? |
No |
| Setbacks Front |
30 |
| Setback Side 1 |
25 |
| Setback Side 2 |
25 |
| Setback Rear |
25 |
| Stories |
1 |
| Heated Area (Sqft) |
400 |
| Total Area (Sqft) |
400 |
| Total Estimated Cost |
33000 |
| Building Code Occupancy Types |
Residential |
| Occupancy Use Title |
single family dwelling |
| Dev Permit # |
F023- |
| Building Code Edition |
2020 Florida Building Code 7th Edition and 2017 National Electrical Code |
| Septic# |
21-0784 |
| Is this an addition for commercial or residential use? |
Residential |
| Sealed roof decking options. (Must select one.) |
a self-adhering polymer-modified bitumen underlayment complying with ASTM D1970 applied over the entire roof. |
Review Notes
| 10/26/2021 |
Point Review - Received-Hard Copy Application |
| 10/26/2021 |
Point Review - Reviewed |
| 10/28/2021 |
Plan Review - Documents Required |
| 11/19/2021 |
Zoning Review - Reviewed |
| 11/22/2021 |
Plan Review - Building Approved |
| 11/22/2021 |
Zoning Review - Reviewed |
| 11/22/2021 |
Plan Review - Mechanical Approved |
| 11/22/2021 |
Plan Review - Plumbing Approved |
| 11/22/2021 |
Plan Review - Reviewed |
| 11/22/2021 |
Final Review - Reviewed |
| 11/22/2021 |
Final Review - Payment Needed |
| 11/24/2021 |
Permit Issued |
Contractors
| Name / Business |
License |
Title |
Role |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Passed: Building - Footer |
|
Matt Forsyth |
11/29/2021 |
| Passed: Engineering - Setbacks |
|
Matt Forsyth |
11/29/2021 |
| Failed: Plumbing/Gas - 1st Underground Rough–In |
Waste Pipes Need To Be Capped And One Pipe Filled With Water So We Can Make Sure There's No Leaks |
Matt Forsyth |
12/17/2021 |
| Passed: Plumbing/Gas - 1st Underground Rough–In |
Item Addressed |
Matt Forsyth |
12/21/2021 |
| Passed: Building - Roof Decking |
|
Matt Forsyth |
2/22/2022 |
| Passed: Building - Wall Sheathing |
|
Matt Forsyth |
2/22/2022 |
| Passed: Building - Framing |
|
Matt Forsyth |
3/29/2022 |
| Passed: Electrical - 2nd Rough-In |
|
Matt Forsyth |
3/29/2022 |
| Passed: Plumbing/Gas - 2nd Rough-In |
Partial Inspection Need Tub Set To Complete |
Matt Forsyth |
3/29/2022 |
| Passed: Building - Final |
|
Matt Forsyth |
6/13/2022 |