Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit
Address 610 SW CHESTERFIELD CIR
LAKE CITY, FL 32024
Parcel #: 03117-143
Acres: 0.49
Owner: Delta Omega Properties Inc
Subdivision: Crosswinds Phase 1
Zoning: RSF-2
Flood Zone: X
District: 3
Application #: 52448
Permit #: 000043201
Related Permit: Culvert: 000043202
Submitted: Sunday, November 7, 2021
Issued: Thursday, November 18, 2021
Expires: Tuesday, April 12, 2022
Completed: Tuesday, April 12, 2022
Status: Completed
Septic Release? Yes
Notes:
CHECK SIDE SETBACKS IN FIELD
Job Details
This is the construction of a Single Family Dwelling
Heated Area (Sqft) 1677
Total Area (Sqft) 2560
Stories 1
Building Height 20
Building Code Construction Type V
Building Code Element B
Building Code Occupancy Types Residential
Occupancy Use Title single family dwelling
Setbacks Front 25'
Setback Side 1 10'
Setback Side 2 10'
Setbacks Rear 15'
Septic# (00-0000) or (X00-000) 21-0874
Building Code Edition 2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Elevation regulation Minimum Requirement
Finished floor requirement One foot above the road
Fema map number 12023C0381D
In floodway N
Sealed roof decking options. (Must select one option per FBC 2020 7th Edition) two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Review Notes
11/8/2021 Point Review - Received-Hard Copy Application NEEDED: *911 ADDRESS VERIFICATION ***PRIOR TO INSPECTIONS*** RECORDED NOC
11/10/2021 Plan Review - Building Approved NEEDED: *911 ADDRESS VERIFICATION ***PRIOR TO INSPECTIONS*** RECORDED NOC
11/10/2021 Plan Review - Electrical Approved NEEDED: *911 ADDRESS VERIFICATION ***PRIOR TO INSPECTIONS*** RECORDED NOC
11/10/2021 Plan Review - Mechanical Approved NEEDED: *911 ADDRESS VERIFICATION ***PRIOR TO INSPECTIONS*** RECORDED NOC
11/10/2021 Plan Review - Plumbing Approved NEEDED: *911 ADDRESS VERIFICATION ***PRIOR TO INSPECTIONS*** RECORDED NOC
11/10/2021 Plan Review - Reviewed NEEDED: *911 ADDRESS VERIFICATION ***PRIOR TO INSPECTIONS*** RECORDED NOC
11/16/2021 Zoning Review - Reviewed ***PRIOR TO INSPECTIONS*** RECORDED NOC
11/17/2021 Zoning Review - Corrections Needed *NEED REVISED SITE PLAN WITH SETBACKS FROM PROPERTY BOUNDARY TO PROPOSED DWELLING
11/17/2021 Zoning Review - Reviewed
11/17/2021 Zoning Review - Reviewed
11/17/2021 Final Review - Payment Needed
11/18/2021 Permit Issued Permit #000043201 created and approved.
3/17/2022 Final Review - Payment Needed
Contractors
Name/ Business License Title Role
Brian T Giebeig
Trent Giebeig Construction,inc.
CRC1330693 Residential Contractor Contractor
Everton D Ruddock
D&s Lighting Inc
EC13003800 Electrical Contractor Subcontractor
Derrick L Williams
Dl Williams Heating & Cooling Llc
CAC1816913 Class "b" A/c Contractor Subcontractor
Kenneth R Roche
Ken Roche Plumbing Inc Dba Plumbing Now
CFC1426527 Plumbing Contractor Subcontractor
Brian T Giebeig
Trent Giebeig Construction,inc.
CRC1330693 Residential Contractor Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Engineering - Initial Driveway Jones, Richard 11/18/2021
Passed: Building - Footer Troy Crews 11/19/2021
Passed: Engineering - Setbacks Troy Crews 11/19/2021
Passed: Electrical - Temporary Service Troy Crews 11/19/2021
Release to power company Troy Crews 11/19/2021
Passed: Plumbing/Gas - 1st Underground Rough–In Waste Only Matt Forsyth 12/1/2021
Passed: Building - Slab Matt Forsyth 12/7/2021
Failed: Building - Roof Decking Roofdeck Needs To Be Completed And All Shiners Removed And Re Nailed Matt Forsyth 1/27/2022
Passed: Building - Wall Sheathing Matt Forsyth 1/27/2022
Passed: Building - Framing Check For Tension Straps On Top Plate Anthony Aslan 2/3/2022
Passed: Electrical - 2nd Rough-In Island Raceway Being Installed 4 Receptacle Matt Forsyth 2/17/2022
Passed: Mechanical - Rough In Matt Forsyth 2/17/2022
Passed: Plumbing/Gas - 2nd Rough-In Matt Forsyth 2/17/2022
Passed: Building - Insulation Matt Forsyth 2/22/2022
Passed: Electrical - Permanent Power Need Septic And Drive Way Releases For Power Matt Forsyth 3/18/2022
Cancelled: Electrical - Permanent Power Melissa Garber 3/30/2022
Septic Release Inspection Health Dept 3/30/2022
Release to power company Melissa Garber 3/31/2022
Passed: Engineering - Final Driveway Smith, Blake 3/31/2022
Passed: Building - Final Matt Forsyth 4/12/2022