Permit Details

Permit Search

Permit

Additions

418 SW ACE LN
LAKE CITY, FL 32025

Permit #
000043148
Application #
50275
Status Completed
  1. Submitted Nov 10, 2021
  2. Issued Nov 10, 2021
  3. Expires Apr 25, 2023
  4. Completed Oct 27, 2022

Property

Parcel #
08120-028
Owner
Weatherspoon Robert L
Acres
0.40
Subdivision
Country Village
Zoning
RSF-2
Flood zone
X
District
5

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0294D
Is this an addition for commercial or residential use?
Residential
Description of addition:
sun room
Total Estimated Cost
20000
Heated Area (Sqft)
196
Total Area (Sqft)
196
Stories
1
Building Height
10
Select driveway access to property:
Existing Drive
Fire sprinklers?
No
Building Code Construction Type
V
Building Code Occupancy Types
Residential
Building Code Element
B
Occupancy Use Title
single family
Setbacks Front
25
Setback Side 1
10
Setback Side 2
10
Setback Rear
15
Septic#
x-city
Dev Permit #
F023-
Building Code Edition
2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Sealed roof decking options. (Must select one.)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.

Status & Review History

  1. Point Review - On Hold-Incomplete
  2. Point Review - Received-Hard Copy Application
  3. Application Converted
  4. Point Review - Received-Hard Copy Application
  5. Plan Review - Documents Required
  6. Zoning Review - Reviewed
  7. Final Review - Documents Required
  8. Final Review - Payment Needed
  9. Permit Issued

Contractors

This is an owner-builder project.

Inspections

  1. Dec 22, 2021

    Passed: Building - Footer

    Inspected by Troy Crews

  2. Dec 22, 2021

    Passed: Engineering - Setbacks

    Inspected by Troy Crews

  3. Apr 13, 2022

    Cancelled: Electrical - 2nd Rough-In

    Inspected by Troy Crews

  4. Apr 13, 2022

    Passed: Building - Framing

    Inspected by Troy Crews

  5. Jun 16, 2022

    Passed: Electrical - 2nd Rough-In

    Inspected by Troy Crews

  6. Jun 16, 2022

    Passed: Mechanical - Rough In

    Inspected by Troy Crews

  7. Jun 16, 2022

    Passed: Building - Insulation

    R30 And Ceiling And R19 In Walls

    Inspected by Troy Crews

  8. Oct 27, 2022

    Passed: Building - Final

    Inspected by Troy Crews