Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Mobile Home Permit

Address 344 NW OOSTERHOUDT LN
LAKE CITY, FL 32055
Parcel #: 01945-005
Acres: 2.00
Owner: Smith Johnny R & Narragansett
Subdivision: Northwood Acres Unr
Zoning: A-3
Flood Zone: A
District: 1
Application #: 49385
Permit #: 000043121
Related Permit:
Submitted: Monday, October 18, 2021
Issued: Monday, November 8, 2021
Expires: Tuesday, May 17, 2022
Completed: Tuesday, May 17, 2022
Status: Completed
Septic Release? Yes
Notes:
LEGAL LOT OF RECORD PRIOR TO 1991
Job Details
Elevation regulation Minimum Requirement
Finished floor requirement One foot above the road
Fema map number 12023C0195D
Mobile Home is a: Single Wide
Year Built 1997
Width (Ft.In) 14
Length (Ft.In) 76
Driveway access to home: Existing Drive
Installation Decal # 72947
Septic # (00-0000) or (X00-000) 21-0452
Setbacks Front 30'
Setback Side 1 25'
Setbacks Rear 25'
Dev Permit # F023-
Setback Side 2 25'
Are you applying for a 5 year temporary permit? No
Serial # fla14612966
Wind Zone? 2
Residential or Commercial Use? Residential
Review Notes
5/20/2021 Point Review - Received-Hard Copy Application
9/10/2021 Point Review - On Hold-Incomplete
10/20/2021 Point Review - Processing
10/20/2021 Zoning Review - Reviewed
10/29/2021 Plan Review - Reviewed
11/8/2021 Permit Issued
Contractors
Name/ Business License Title Role
Damarquis A Williams

IH1128217 Mh Installer (ih) Contractor
Inspections
Inspection Notes Performed By Date
Passed: Mobile Home - In County Pre-Mobile Home before set-up Troy Crews 10/19/2021
Septic Release Inspection Health Dept 5/13/2022
Passed: Mobile Home - Mobile Home Set-Up Final Troy Crews 5/17/2022
Release to power company Troy Crews 5/17/2022
Passed: Engineering - Setbacks Troy Crews 5/17/2022
Release to power company Sve Claiming They Did Not Recieve The Power Release Melissa Garber 5/18/2022